Loading…
Loading…
78 results • Recent activity
KORLE SATANDI MEDIUM IRRIGATION PROJECT TAL DEVGAD DIST SINDHUDURG Construction Of Left and Right Side Protection wall and Plugging wall near Waste Weir, Construction Of Remaining Work of Tail Channel Construction of Road from Tail Channel Bridge
CADWM Works on Direct Outlets 1 to 10 and Minors 1 to 25 on Left Bank Canal of Aruna Medium Irrigation Project Tal Vaibhavadi Dist Sindhudurg
Renovation of Remaining 2 flats in R-3/C building, Remaining 8 flats in R-4 Residential building and other allied works at Tilari colony, Charathe-Sawantwadi.
Construction of concrete Gutter km0 0 to 690 and black topping to road from wel to Rehabilitation village at Kinjlicha Mal Gaothan At Aruna Medium Project AT Vaibhavvadi
Constructing Protection wall for VRB at Ch. 11.470m Cleaning of Canal section in Km 10 to Km 14 , Constructing RCC lining at ch. 16.100 to 16.320 m. and WBM Road in Km 24 to 27 of Banda Branch Canal
Advancement and Upgradation of Existing IoT-Based Data Transmission System at Tilari Main Earthen Dam, Tilari Saddle Dam and Tilari Teravan Dam Under Tilari Interstate Project, into a state-of-the-art smart dam system (to transmit all the requir