Loading…
Loading…
4 results • Latest
"Ranchi Adra Division"- Conversion of existing bridges into Composite girders/Ballasted decks for running of 25T Axle loaded freight trains @ 100Kmph in (a) Bridge no. 398 (3x18.3m) of ORGA-HATIA section (b) Bridge no. 378 DN (4x18.3m) of Hatia-Muri section (c) Bridge no. 83DN (3x18.3m), 89DN (1x18.3m) and 98DN (2x18.3m) of BKSC-KSX section (d) Bridge no. 19 (2x6.10m+5x18.3m) and 31 (1x18.3m) of TLE-BKSC section (e) Bridge No. 403 UP (2x6.10m+2x12.2m+1x18.3m) of ADRA - GMO section."
"KGP Division"- Conversion of existing bridges into Composite girders/Ballasted decks for running of 25T Axle loaded freight trains @ 100Kmph in (a) Bridge No. 69 DN (Span 4x18.3m) in between station GTS-DVM Bridge No. 94UP (Span 2x18.3m) in between station JGM-GII (b) Bridge No. 217 UP (Span 9x18.3m) in between station RGT-ARD (c) Bridge No. 235UP (Span 9x18.3m) in between station BTS- NMBR (d) Bridge No. 235DN (Span 9x18.3m) in between station NMBR-BTS (e) Bridge No. 264UP (Span 9x18.3m) in between station HIP-BLS (f) Bridge No. 238 UP (Span 3x12.2m) in between station NMBR-ROP & Bridge No. 239 UP (Span 2x12.2m+2x18.3m) in between NMBR-ROP (g) Bridge 239 DN (Span 2x12.2m+2x18.3m) in between station ROP-NMBR & Bridge No. 258 UP (Span 4x12.2m) in between station HIP-BLS (h) Bridge No. 217DN (Span 9x18.3m) in between station ARD-RGT & Br. No. 234UP (Span 5x12.2m) in between station BTS-NMBR (i) Bridge No. 168DN (Span 4x12.2m+2x18.3m) in between station VKD-NYA & Bridge No. 176 DN (Span 3x12.2m) in between station BLDA-VKD."
Bridge Zonal Works for maintaining and repairing of bridges including new addition & alteration in the jurisdiction of SSE/BR/SINI under ADEN-Br-Line/CKP in CKP Division period ending up to 30.09.2027 (For Period of Two Years i.e. from 01.10.2025 to 30.09.2027).(2nd Call).
Bridge Zonal Works during the period from 01.10.2025 to 30.09.2027 under the jurisdiction of AXEN(Bridge Line)/Adra (2nd Call).