Tender Value
₹51.0 Cr
EMD Value
₹27 L
Closing Date
30 Jan 2026, 11:30 amClosed
"Ranchi Adra Division"- Conversion of existing bridges into Composite girders/Ballasted decks for running of 25T Axle loaded freight trains @ 100Kmph in (a) Bridge no. 398 (3x18.3m) of ORGA-HATIA section (b) Bridge no. 378 DN (4x18.3m) of Hatia-Muri section (c) Bridge no. 83DN (3x18.3m), 89DN (1x18.3m) and 98DN (2x18.3m) of BKSC-KSX section (d) Bridge no. 19 (2x6.10m+5x18.3m) and 31 (1x18.3m) of TLE-BKSC section (e) Bridge No. 403 UP (2x6.10m+2x12.2m+1x18.3m) of ADRA - GMO section."
BR-HQ-ADA-RNC-25-26-13~SER
BR-HQ-ADA-RNC-25-26-13
Open
Works - General
18 Months
Ranchi, Jharkhand
₹0
₹27 L
30 Jan 2026
19 Dec 2025
16 Jan 2026
2 Jan 2026
A-Execution of all works related to above work covered under SER
B-Execution of all works related to above work covered under SER
C-Execution of all works related to above work covered under SER
D-Execution of all works related to above work covered under DSR-2021
E-Execution of all works related to above work as per Schedule-E (NS
F-Execution of all works related to above work as per Schedule-F (NS
Using Soil Class SQ2 SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer- in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
In classifications of soil except rock
Manufacturing of blanketing cum material by wet mixing of naturally available suitable soil including additional blending with naturally a v a ila b le or manufactured material as required to achieve specified gradation, in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Supplying, laying Non-woven Needle Punched and Mechanically or Thermally bonded type Geotextile for use as Separator/Filtration for Railway formation as per RDSO Specification No. RDSO/2018/GE:IRS-0004 - Part I made of Polypropylene / Polyethylene / Polyamide or combination there of having apparent opening size of less than or equal to 85 microns and elongation at failure more than 50% in both directions including transportation labour, lead & lift complete as directed by Engineer in-charge.
On top of subgrade or Sqm prepared subgrade before laying blanketing layer with minimum strengths in Grab test, Trapezoidal Tear test a n d Puncture test of 700N, 250 N and 1800 N respectively.
Making suitable designed cum staging for cast in-situ PSC girders/slabs up to 10.5m height from bed level up to soffit of girder/slab with all contractors materials, machinery, tools and plants, transportation complete in all respects required for casting and removal of the same after completing the work and restoring the site to original. Note: The payment for staging shall be made on the cubical quantity of concrete of main Girders/slabs. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Design, supplying and fixing in Centimetre position elastomeric bearing true to line and level conforming to IS:3400, IS:226, BS-5400 under prestressed concrete girders/ Steel Girders, for Pre-cast as well as cast-in-situ girders as per approved drawing. The rate shall include cost of load test of one no. bearing from Railway approved firms and all fixing materials, equipments, machineries, labour, taxes, loading, unloading, leading, lifting etc. complete. Rates include getting the drawing approved from Railway and cost of inspection during manufacturing from railway approved organization.Note : 1. The rate is for finished item complete and paid only after fixing in position below the girder. 2. The volume shall be as given in the drawing and no deduction shall be made for inserted steel plates etc. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
Above 5 km up to 10 km
Above 10 km up to 15 km
Above 15 km up to 20 km
Above 20 km up to 25 km
Above 25 km up to 30 km
Above 30 km up to 35 km
Above 35 km up to 40 km
Above 40 km up to 60 km Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
Above 60 km up to 80 km
Above 80 km up to 100 km
Above 100 km up to 150 km MT
Above 150 km up to 200 km MT
Above 200 km SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge.
50mm dia. Drainage Spouts Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved Q A P and drawings conforming to IRS-B1-2001 and other relevant codes and s p e c i fi c a t i o n s . Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Plate Girder/Semi Girder/Composite Girder (Steel Work)
Supplying and fixing HSFG Kg bolts of any dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 f o r bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns.
On fabrication Providing and fixing various size HTS holding down bolts conforming to relevant Codes/Specification in concrete column or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job.
Supplying, Fabricating and MT fixing access ladders, inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item.
Supply & applying two coats Sqm of bitumen emulsion of Grade RS-1, conforming to IS:8887 on the top surface of concrete deck slab (New bridges) @ 1.70 kg/sqm after cleaning surface with all materials, labour, tools and plants, equipment etc. complete. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Launching in position, by any approved method, pre- fabricated Steel Girders, precast PSC girders/slabs, c a s t e d at casting bed developed at site, to correct alignment and level over the bed block / pedestal with all required arrangements, complete in all respect.
PSC girders / slabs
Structural steel plate girders MT Delaunching of all types of Steel girders, PSC girders/Slabs and stacking away from river stream or passage as directed by Engineer in charge with all labour, tools and plant, equipment etc., complete.
Structural steel plate girders. MT
Supplying fabricating and MT erecting welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, r i v e t i n g , hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer- i n - c h a r g e . Note: The payment shall be made on the theoretical weight of main components and gusset plates only. Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra).
1200mm dia. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Pulling & positioning of rails accurately on cess including supporting rails, providing required gap and squaring at ends for renewal preparation, as directed by Engineer in-charge.
More than 40 m long rail RM panel Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for w e l d i n g and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately.
For Through Rail Renewal TRM work Through Sleeper Renewal (TSR) with PSC sleepers involving removal existing sleepers of any type along with fittings from track, insertion of PSC sleepers lying along the cess / formation / slope / toe within 5 metres height with all fittings to specified spacing, gauge and squareness, one round of through packing to make track fit for 20 kmph speed, dressing of ballast to standard profile, all in accordance with the latest provisions of IRPWM and stacking of all released material neatly at specified places within an average lead of 100 m as directed by Engineer in-charge.
For PSC wider base sleepers - Each For location of work involving deep screening. (deep screening to be paid separately) Fixing of fish plates with fish bolts on a joint of all rail sections duly lubricating fish plates/bolts with contractor's grease graphite in running track condition including transportation of fish plates and fish bolts from nearest station / store / level crossing. Note: Rail cutting & drilling to be paid separately.
Fish plates with 4 fish bolts.
Fish plates of 6 bolts. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Lubrication of Elastic Rail ERC Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in e m e r g e n c i e s with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only.
In-situ situation Drilling of hole of different diameter and chamfering, in rail of any section and any UTS manually only in emergencies with contractor's labours, tools & plants, consumables etc.
Hole of dia. 26.5mm and Each above Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge :
Rail section of 52Kg and Each above
Renewal of existing SEJ with Set improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. N o t e : (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Assembling and Laying of Improved Switch Expansion Joint (SEJ) on PSC sleepers of any rail section as per RDSO drawing including leading of SEJ rails, sleepers, fittings for a free lead of 250 metres, cutting of rails, drilling of holes as required and lubrication of SEJ, gauging, aligning rails, providing temporary connection with adequate welding gap with adjoining rails, providing reference posts at SEJ, first through packing of SEJ portion to make track geometry fit for 30 kmph speed and making ballast profile as per IRPWM. Note: (1) Rail cutting and hole drilling shall be paid separately.(2) One set comprise complete SEJ on both rails at SEJ.
Under requiring Traffic Block
Under Conditions
Dismantling existing SEJ (Switch Expansion Joint) assembly during line block and its replacement with plain track as of adjoining section with all fittings including rail cutting and drilling of holes and renewal of special sleepers with PSC Sleepers as directed and aligning rails, providing fishplates and bolts/ temporary connection with adequate welding gap with adjoining rail and ensuring proper track geometry for 30 kmph speed. The release material shall be stacked as directed by Engineer in charge. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Manual deep screening of Plain track/ turnouts under traffic as per procedure prescribed in IRPWM, June 2020 or latest, in other than PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts.
Depth of 250 mm below TRM bottom of sleeper of Plain Track Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by E n g i n e e r- i n - c h a r g e . Note: Payment shall be made based on ballast stack measurement.
For average lead up to 50m cum and lift up to 5m
Extra over item no. 082011 Each for each additional average lead of 50m or part thereof when total average lead exceeds 50m, but up to 250m. Note: This item may be used only in exceptional circumstance under prior order on record.
Extra to item no. 082011 for Each each additional average lift of 1m or part thereof when total average lift exceeds 5m. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Lifting regrading the existing PSC s l e e p e r track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in- charge.
Extra for additional lift over TRM 75mm for every 50mm lift or part thereof up to 275mm for item nos. 083010 for each TRM.
Cess repair/widening work as cum per RDSO Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the v e g e t a t i o n , benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on t h e progress of earthwork starting from toe of the embankment. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Extra over item 113010 for cum earth-work for making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge.
Linking of BG track (with TRM guard rail ) over ballasted deck bridges with any type of rail section and PSC sleeper i n c l u d i n g leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking. Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual
For PSC sleeper Track with TRM Sleeper Density of 1540 Sleepers/Km or more SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Anti-corrosive painting of rail on running track of any sleeper density on web, foot etc. including liner contact area (excluding bottom of foot) and fishing plane as per requirement with two coats o f thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including painting of liners, ERCs and including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM Note: 60% of payment shall be made if painting on only gauge face side is done.
For 60 Kg Rails
For 52 Kg Rails Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in- charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
60 Kg - 110/90 UTS - Outside Each Track
60 Kg - 110/90 UTS - On Each Running Line Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
On Running Line SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Drilling holes of specified Each size for bond holes with 7.2mm dia drill twist to correct spacing and location on 60kg/52kg rails on cess or under traffic block with contractor's tools and plant, equipment, consumable, labour etc complete as directed by the Engineer in charge at site. Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period.
For lead beyond 500 metre MT and up to 1 Km.
Extra to Items no. 171032 for MT ( X 3) lead beyond 1 Km for every subsequent Km or part thereof and up to 10 Km Loading, unloading and hauling of 52Kg / 60Kg rail more than 13 metre and up to 39 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic and line protection in case road carriage is not possible for different leads and lift up to 5 metre.
For lead beyond 500 metre MT and up to 1 Km Loading, leading and unloading of all types of P.Way fittings and all other m i s c e l l a n e o u s material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.
Lead up to 5 Km
Lead beyond 5 Km and up to MT 10 km
Lead beyond 10 Km and up MT to 20 km
Lead beyond 20 Km and up MT to 30 km
Lead beyond 30 Km and up MT to 50 km
Lead beyond 50 Km and up MT to 100 Km
Lead beyond 100 Km and up MT to 150 Km SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Extra for every Km per MT MT-Km beyond 150 Km over item no. 172047 Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Lead up to 5 Km
Lead beyond 5 Km and up to MT 10 km
Lead beyond 10 Km and up MT to 20 km
Lead beyond 20 Km and up MT to 30 km
Lead beyond 30 Km and up MT to 50 km
Lead beyond 50 Km and up MT to 100 Km
Lead beyond 100 Km and up MT to 150 Km
Extra for every Km per MT MT-Km beyond 150 Km over item no. 172057 Dismantling existing track on girder bridges including guard rails and foot path etc., cutting existing SW panels / LWR, if required into free rails of not less than 12 metre length and leading all released materials to nominated place within 50m of bridge approaches and stacking the released m a t e r i a l s clear of i n f r i n g e m e n t s , as per direction of Engineer-in- Charge. Note: Rail cutting and drilling shall be paid separately.
Under Conditions
Removing Channel/H-Beam sleepers with fittings from the running track under traffic block for T B T R & stacking the same neatly at specified places with contractor's tools & labour, as directed by Engineer in-charge.
Extra to item no. 192010 for Each Track Circuited area including handling of released PVC washers on bolts and extra rubber pads on sleepers SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Complete Track Renewal on TRM Bridge with Steel Channel/H- beam sleepers as per approved drawings including leading of running and guard rails, sleepers and fittings, bending of guard rails, drilling of holes, cutting of rails etc. and leading the released rails, sleepers & fittings near bridge approaches under traffic block as directed and making track structure fit for normal speed. Note: 1) Rails, Steel Channel/H-beam sleeper and all fittings will be supplied by Railways. 2)Transportation of track material if supplied beyond 250m of bridge approaches, shall be paid separately under relevant item.
Manufacture of flared portion Set of Guard Rail by cutting and bending to required shape & RDSO's approved drawings. N o t e : (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right.
Providing and fixing of flared Set portion of guard rails of any rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot.
Drilling holes 25mm to Each 40mm dia. with drill twist in the foot of guard rails for fixing guard rails on bridge as directed. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Drilling of 25mm to 40mm Each dia. holes in PSC sleepers with suitable rotary hammer / drilling machine at indicated location for fixing of guard rails on bridges & its approaches as per approved drawing and fixing of contractor's HDPE dowels a n d adhesive of approved quality to Drawing no. RDSO/T-3002, procured from RDSO's approved sources with contractor's materials and consumable.
Dismantling of existing flared Set portion of guard rails of any rail section over PSC sleepers duly removing rails & fastenings and leading and stacking released materials at nominated place within free lead, clear of infringements, complete and as directed. Note: One set consists of LH & RH side rails of one end. Supplying & fixing of Anti- Skid MS / Stainless Steel chequered plates on un- ballasted deck bridge as per approved drawings, with matching grade stainless steel fasteners as directed by Engineer-in- Charge, on new bridge or replacement of existing chequered plates on old bridge including removal of old chequered plates and stacking near approaches of bridge, clear from all infringement. Note: Joints of chequered plates shall not fall in between sleepers
Anti-Skid chequered plate conforming to latest IS: 6911, ISS Symbol 409 M, minimum 6mm thick (excluding bead height) with flat bottom and top pattern conforming to IS: 3502, 1A with bead height of minimum 0.8 mm - on New Bridges as per RDSO drawings. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type- IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In- charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed.
Caution Indicator Board of Each size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long
Speed Indicator Board of Each equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long
Stop Indicator Board of size Each 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long
Termination Indicator Board Each of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long Total 241688439.83 SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Execution of all works related to above work covered under SER USSOR-2021 as per Schedule-A Item- 2 (Minor Component - Strengthening of substructure and allied works). S No. Item No Description of Item Unit Qty Rate Amount Turfing / planting, including all lead & lift and watering as required until properly rooted with. Note: Initially payment of only 40% will be made. Balance 60% will be paid after 3 months of maintenance period, only if the turfing is properly rooted on entire turfed area.
Turfing with sods, 10cm thick 100 Sqm and 20cm square closely laid.
Turfing with planted doob 100 Sqm grass.
Supplying, erecting in all types of soils, hard wood pile 5m to 7m long without joint, 125mm average dia. for protection of bank slope including two coats of coal tar paint complete, as directed. Note: Payment will be made as per actual driven length of pile.
Driving rails 90R/52 Kg Metre section below average ground level within the slope/toe of embankment including making of nose with contractor's own arrangement complete in all respect Note: Payment will be made as per actual driven length of rail which will be supplied free by Railways at the site of work.
Shoring with 'Z' section MS Sqm sheet piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in- charge Note: Payment will be made as per actual driven length of pile. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area.
30m to 40m Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing w a t e r with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR.
Erection working platform to drill bore hole through flowing/standing water through river bed up to water depth of 1.5m, and dismantling after completing work and removing from the site to clear the water way. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Taking out 100mm dia. & Each 450mm long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
Conducting penetration test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge
Collection of water samples Each at required intervals Conducting laboratory Tests on collected soil samples as per relevant IS code
Moisture Density
Atterberg Limits
Specific Gravity
Grain size analysis including Each Hydrometer analysis
Direct Shear Test
Natural Density
Consolidation Test
Unconfined Compression Test Each
Tri-axial Test Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code
Water Absorption & Porosity
Unconfined Compression Test Each
Point Load Test
Modulus of Elasticity
Abrasion Testing SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock blasting)
Hard prohibited ) Providing and laying in position Plain cement concrete of specified Nominal M i x f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of C e m e n t , centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ cum coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:2:4 (1 cement : 2 coarse cum sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse cum sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse cum sand (zone-III): 6 graded stone aggregate 40 mm nominal size). SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY P r o v i d i n g and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment cap, Pier Cap, cum Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Providing and laying in cum position machine batched, machine mixed and machine vibrated Design Mix Cement Concrete, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, of specified grade (cast in-situ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in Drop and curtain wall and alike structures below bed level, complete in all respect as per drawings and technical specifications to the satisfaction of Engineer-in- Charge. Note: Payment for cement, reinforcement and shuttering shall be made extra. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub- Sqm structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super- Sqm structures, e.g. slabs, I- girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height Sqm over item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof.
P r o v i d i n g and laying in cum position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded crushed stone aggregate and coarse sand of approved quality in jacketing of piers and abutments from bottom of foundation up to a height of
of jacketing including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be paid extra under relevant item. 2. Plasticizer shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticisers at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over 025040 for drilling of holes and insertion of dowel bars in case of Jacketing SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Extra for drilling 32mm dia. Metre holes for jacketing / anchoring
Extra for inserting of dowel Metre bars of specified dia. (cost of rods to be paid extra)
Supplying, spreading and cum compacting well graded hard stone of 63mm average size (maximum up to 80mm size) in the bottom of foundation of box culverts, bridges etc. including all lead, lift, ascent, descent etc. complete job as per directions of Engineer In- charge.
Providing and launching in cum position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Providing, fabricating & fixing MT in position to exact design profiles, H.T.S. cables of all classification made from Low Relaxation strands conforming to IS:14268- latest version in Prestressed (Post-tensioned) Concrete girders/slabs etc. including supplying, cutting, making into cables with necessary spacers, colour coding, protecting with water soluble oil at all time, anchoring of cables, supplying and placing spiral corrugated type galvanized metal steel ducts sheathing made up of Cold Rolled Cold Annealed (CRCA) mild steel conforming to IS:513 of required diameter/ thickness, vent pipe, placing, bending, routing, fixing, stressing & grouting of cable ducts with cement grout, Anchorage sets in required number with provision for future prestressing if any including all lead and lift with contractor's own materials, labour, equipments etc. complete as per drawings & specifications. Rate also includes covering anchorage pads with epoxy mortar of approved quality to avoid corrosion. Cement for grouting to be paid separately. Payment shall be made in terms of weight of HTS cables as per drawing.
Extra sheathing in place of CRCA sheathing
Supplying and laying in cum position specified grade precast prestressed cement concrete ballast retainers of size, as directed by Engineer In-charge. Payment for Shuttering, Cement, reinforcement, HTS cables, anchorage cones, stressing of cables and grouting of the ducts will be done extra. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load.
For Span design load up to Each 100 MT
Providing Flood Level Gauges Sqm on abutments and piers, made by 20mm thick 1:4 cement plaster for a width of not less than 300mm, duly engraving markings & figures in metres, divided into 10 parts commencing from under-side of girders towards bed, painting markings & figures with black enamel paint in three coats on white background including painting HFL Mark in white by side of gauge with year of occurrence with all Contractor's materials, labour, tools, scaffolding and supports, lead & lifts, curing etc. complete as per approved drawing and as directed by the Engineer in- charge excluding cost of cement which shall be paid extra. Painting of cleaned plate/composite bridge g i r d e r s including all s c a ff o l d i n g along with provision of Jhoola / hanging scaffolding ladders etc. where required.
With two coats of epoxy Sqm paint conforming to RDSO spec M&C/PCN/123-11 Note: DFT of each coat shall be 60 microns.
Providing and laying boulders cum apron on river bed for protection against scour with stone boulders weighing not less than 35 kg each with voids filled with spalls complete as per drawing and Technical Specification. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Laying of boulder apron laid cum in wire crates of approved size including overlaps at joints, laid with stone boulders, all loose ends to be tied with 4mm galvanised steel wire. Payment for boulders & wire crates to be done extra.
Supplying of stone boulders cum weighing not less than 35 kg each at specified bridge locations.
Manufacture and supplying Sqm Galvanized Wire Net Trungers made from 4mm galvanised steel wire @ 32 kg/10sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100mm x 100mm.
Providing and laying Pitching cum with Stone Boulders, weighing not less than 35kg each with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item).
Supply and laying of coarse cum sand including consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media.
Providing nipples of size 12 to 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
Neat Cement Grout with 20% Kg anti shrinkage compound w.r.t. cement.
Painting the HFL mark and Each Danger level mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete.
Providing cast in situ bridge Each number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts.
Providing cast in-situ plaques Each for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Supplying, spreading and cum filling coarse sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in- charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
Dewatering of natural or HP Hour accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. Designing and developing D e t a i l e d structural and w o r k i n g Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof- checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in- charge.
Open / Pile / Well Foundation Set for piers/abutments
Foundation structure for RCC retaining wall, abutment and approach slab SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. 75 022011(022020) Extra over item nos. 022011 cum 3467.70 41.13 142626.50 to 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] 76 022012(022020) Extra over item nos. 022011 cum 175.00 85.57 14974.75 to 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] 77 022014(022020) Extra over item nos. 022011 cum 312.50 237.00 74062.50 to 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 114051504.82 Schedule B-Execution of all works related to above work covered under SER USSOR-2021 as per
Schedule-B (Supply of Cement).
Execution of all works related to above work covered under SER USSOR-2021 as per Schedule-B
(Minor Component - Strengthening of substructure and allied works).
S No. Item No Description of Item Unit Qty Rate Amount
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Supply and using Cement at
grade approved
grade of approved
Schedule C-Execution of all works related to above work covered under SER USSOR-2021 as per
Schedule-C (Supply of Steel Reinforcement).
Execution of all works related to above work covered under SER USSOR-2021 as per Schedule-C
(Minor Component - Strengthening of substructure and allied works).
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement
of approved brands/makes
for R.C.C. work including
straightening, cutting,
bending, placing in position
and binding all complete.
Treated bars of grade Fe-
500D or more of approved
Schedule D-Execution of all works related to above work covered under DSR-2021 as per Schedule-
Execution of all works related to above work covered under DSR-2021 as per Schedule-D (Major
Component - Re-girdering and P-way works).
S No. Item No Description of Item Unit Qty Rate Amount
16.0 ROAD WORK
Supplying and stacking at
compacting stone aggregate
of specified sizes to WBM
specifications in uniform
thickness, hand picking,
rolling with 3 wheeled
road/vibratory roller 8-10
tonne capacity in stages to
proper grade and camber,
applying and brooming
requisite type of screening /
binding material to fill up
interstices of coarse
aggregate, watering and
compacting to the required
Execution of all works related to above work covered under DSR-2021 as per Schedule-D (Minor
Component - Strengthening of substructure and allied works).
S No. Item No Description of Item Unit Qty Rate Amount
DISMANTLING AND
Demolishing cement
concrete manually/ by
mechanical means including
disposal of material within 50
metres lead as per direction
of Engineer - in - charge.
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
1 richer mix (i/c equivalent
2 leaner mix (i/c equivalent
manually/ by mechanical
means including stacking of
steel bars and disposal of
unserviceable material within
50 metres lead as per
direction of Engineer - in-
Demolishing brick work
manually/ by mechanical
means including stacking of
serviceable material and
disposal of unserviceable
material within 50 metres
lead as per direction of
Engineer-in-charge.
Demolishing stone rubble
masonry manually/ by
mechanical means including
stacking of serviceable
15.9 material and disposal of
unserviceable material within
50 metres lead as per
direction of Engineer-in-
vent shaft including
excavating the cement
concrete pit completely,
taking out the shaft, refilling
the excavated gap, stacking
the useful materials near the
site and disposal of
unserviceable materials
within 50 metres lead.
Schedule Schedule E-Execution of all works related to above work as per Schedule-E (NS Items)
Execution of all works related to above work as per Schedule-E (NS -Items) (Major Component - Re-
girdering and P-way works).
S No. Item No Description of Item Unit Qty Rate Amount
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
1 1 Handling of existing Girders Each Span 26.00 19103.02 496678.52
for the purpose of casting of
through type of bed
blocks/pier capping in five
place the total works involve
in Stage-1, Stage-2 and
Stage-3. Stage-1 include
lifting of existing girders to
release the existing bearing,
removal of existing bearings,
insertion of packing of
wooden planks and lowering
the Girders duly maintaining
correct alignment and levels.
Stage-2 includes lifting of
existing Girders to release
the wooden planks, insertion
of Rail cluster/cluster beam
as per approved drawing,
insertion of wooden packing
if required and lowering the
Girders on Rail cluster/cluster
beam duly maintaining
correct alignment and levels.
Stage-3 includes lifting of
existing Girders to release
the Rail cluster/cluster beam.
Removal of rail
cluster/cluster beam
insertion of packing of
wooden planks and lowering
the Girders duly maintaining
correct alignment and levels.
The rate inclusive of
contractor's Jacks of required
capacity, materials, staging,
scaffolding, labour, Plants
and machineries, all lead, lift,
taxes etc. complete as
directed by the Engineer - in
- charge at site.
2 2 Dismantling of existing Bed Numbers 100.00 6511.69 651169.00
plates & Bearings from
existing Bed Block by cutting
& removal of HD Bolts & nuts
with all tools and plants,
machineries, scaffolding,
labour and other materials
and shifting it at one end of
the bridge during traffic
Railway's rail as per railways
approved drawing including
cutting of rails, welding,
bolting, clamping etc.
complete in all respect as per
instruction of Engineer- in-
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
4 4 Drilling of Holding Down Bolt Numbers 3780.00 1237.97 4679526.60
Holes 42 to 52 mm dia in
concrete/RCC Bed Blocks up
to a depth of 450 mm by
Core Cutting Drill of make
HILTI or similar. The rate
includes making all the
necessary arrangements for
drilling holes on the
pier/abutment top including
all labour, machinery and
tools & plants etc. complete
and as directed by the
Engineer-in-charge.
to 27 mm in the existing
girder on web, bottom
flange, verticals, diagonals
and main girder in different
locations with contractor's
own arrangements with all
tools and plants, consumable
items, labour, scaffolding,
transportation etc. complete
in all respect.
fixing and welding with stud
gunsetc of normal headed
shear studs/shear connector
25 mm dia and 200 mm
length confirming to IS 3936-
66 as per specifications of
RDSO Drg. Alongwith ferrules
to top flange of girder for
deckslabs as per the
direction/approval of
Engineer-in-charge. (In case
shear connectors of any
other size is required then
payment shall be made on
the pro-rata basis in
proportion of the weight of
the shear connectors. ) Note:
(This item will be paid in
Composite Girder only).
Note: Here unit Each means
existing corroded
perforated/crack deck plate
& other member with
contractors cutting
equipments, labours,
arrangements & the same to
be deposited in the nearest
BRI store/depot/scrap
yard/PRR as directed by Site-
incharge of the work.
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
girders along with deck
slab/piers/any structural
members etc. including all
tools & plants, equipments,
fuel,hiring charges, all
consumables & other
accessories to complete the
work in all respect. The rate
is inclusive of all drilling/core
cutting works for passage of
diamond wire & crane ceiling
to complete the work in all
respect. All lead, lift, ascent,
decent & crossing tracks are
also included in all items.
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
Preparation of the General
Arrangement Drawing for all
Major Bridge/ROB for Railway
Line Corridor through MX
Rail/AutoCAD for railway
standards/formats based on
finalized L-section for the
proposed alignment,
hydrological investigation &
detailed goetechnical
investigation carried out by
the consultant at proposed
bridge locations, on good
quality tracing paper and
submitting the same to
Railway administration for
approval and carrying out the
corrections as instructed by
railway with all consultants,
own men, material, tools &
p l a n t s , Computer systems
etc. as directed by Engineer-
in-charge. Notes: (1) MAJOR
BRIDGE GAD should
incorporate (a) Sub-structure
details with type of
construction, type of
foundation (pile/open/well
foundation), depth of
foundation, footing details/
pile foundation, foundation
pressure, abutment/pier
details duly showing bore log
details of sub soil along with
details of every soil strata at
every abutment & piers
locations. (b) Span
arrangements with details of
Bed level, HFL, VC, Free
board, Scour depth, Rail
level, formation level, Clear
span, effective span,
catchment area, Q50
discharge. (c) Super
structure details like type of
structure (Steel/PSC), type
girder/slab details, depth of
construction, bearing details,
wearing coat, track structure
with cushion details. (d)
Approach details like trolley
refuges. HE installation,
parapets/steel railings,
inspection platforms with
ladder arrangements, dirt
walls, approach slab, back fill
material as per RDSO
specifications, protective
works such as wing walls,
bank toe walls, pitching, type
of flooring/drop wall/curtain
wall details as per scour
depth & silt factor criteria.
Payment schedule:-(a) 60 %
payment shall be made on
completion of work and
submission of related
documents. (b) balance 40 %
after approval of DPR from
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
10 10 Manufacturing and supplying Numbers 120.00 28.42 3410.40
of MS Dowel bars of specified
dia & length as per drawing
and as per direction of the
Engineer-in-charge including
cement/epoxy mortar
including cement/epoxy
materials which is suitable
for site. Cost of steel rods will
be paid separately.
foundation, pier/abutment,
retaining wall, bed block, fly
wings pedestal, deck slab,
crash barrier, copping,
approach slab etc. with
design mix of M:30 or richer
concrete with contractor's
well graded 20 mm and
below size aggregate, coarse
sand as directed by engineer
Engineer in-charge. The rates
includes contractor's water,
curing, all labour lead, lift,
descent and all incidental
costs such as royalty,
loading, unloading, bending,
binding and placement of
reinforcement etc. providing
and assemmbling rigid steel
formwork to correct
dimensions as directed by
Engineer in Charge. The cost
of designing the mix is to be
borne by the contractor. The
payment towards cost of
cement and reinforcement
will be done vide relevent
schedule (For Deck slab).
Chequered Plates, Channels,
Plates, Angles and I-Section
by hot dip process with Zinc
Coating and mass of Zinc
coating shall not be less than
705 g/sqm and galvanisation
thiockness shall not be less
than 100 microns including
necessary surface
preparation as per Clause-4
Galvanisation shall be done
as per IS:2629-1985 and
IS:4759-1996 with Zinc
conforming to IS: 209-1992,
duly taking all the measures
for safeguarding against
embrittlement of hot-dip
galvanised iron and steel
products as per IS:6158-1984
with all contractor's labour,
material, tools, plant, all
lead, lift and crossing of
tracks etc. complete and as
directed by the Engineer-in-
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
three dimensional cellular
confinement system
GEOCELL made of
ultrasonically welded HDPE
strips, which acts as a sub-
grade/sub-base improving
reinforcement mat weld
distance of each cell = 356
mm, depth of cell = 150 mm
between formation and track
structure in bridge
approaches as per
specifications & conditions
attached as per IS-17483.
The rate is inclusive of all
labour, materials, leads, lifts
crossing of tracks, transport,
including all labour, fuel,
tools and plants etc.,
complete. No payment for
wastages will be made, and
rate may be quoted
Schedule F-Execution of all works related to above work as per Schedule-F (NS Items) (Supply of
Track Ballast) .
Execution of all works related to above work as per Schedule-F (NS Items) (Major Component - Re-
girdering and P-way works).
S No. Item No Description of Item Unit Qty Rate Amount
SER-GRC- BRIDGE LINE ORG.-ENGINEERING/SOUTH EASTERN RLY
size machine crushed hard
variety stone ballast
confirming to latest RDSO's
Specification from outside
the Railway land as per
condition enclosed and
stacking the same at Railway
depot or nominated location
that is on Cess/toe/bank in
station yard, point and
crossing zones, turn in curve
etc as per requirement and
as directed by Engineer
Incharge at site. The rate is
inclusive of loading,
unloading, transportation,
stacking and loading the
same into Railway wagon
with all labours, lead, lift,
decent, ascent, crossing of
Railway lines, levelling of
ground, machineries,
equipment, Royalty, GST and
any other charges incidental
charges etc. NOTE: (1) The
tenderer must submit the
test report of ballast along
with the tender offer in
respect of the following
physical properties tested in
accordance with IS:2386 (i)
Aggregate abrasion value (ii)
Aggregate Impact value (iii)
Water absorption value (2)
The test report should be
from any of the following
Government approved
laboratories only (i)Structural
Division, Civil Engineering
Department, BIT, Sindri,
Dhanbad, Jharkhand (ii)
Transportation Engineering
Section, Civil Engineering
Department, IIT - Roorkee (iii)
Civil Engineering
Department, Banaras hindu
University, Varanasi (iv)
National Test House, Alipore,
Kolkata (v) Bengal
Engineering College, Shibpur,
Howrah (vi) Jadavpur
University, Jadavpur, Kolkata
(vii) NIT - Durgapur, West
Bengal (viii) IIT - Kharagpur
(ix) Regionel Engineering
College, Rourkela and (x)
Railway's Laboratory at
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
MinutesofthePRE-BIDConferenceADA-RNC_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .