Loading…
Loading…
630 results • Recent activity
Repairing pump base structure including the platform inside the pump house of 200 cusec vertical pump units no. 4 with allied works at new station of BDPS.
REMOVAL OF SILT, FLOATING MATERIALS FROM NIKASHI DRAIN NEAR F-41, MAHERMANJIL IN WARD NO. 134 UNDRE BR. XV
REMOVAL OF FOREIGN MATERIALS,SILT ETC. FROM BOISTOM PARA NIKASHI DRAIN IN WARD NO. 133 UNDRE BR. XV
REMOVAL OF SILT, FLOATING MATERIALS FROM NIKASHI DRAIN NEAR HARI BABU PALLY LANE AND ADJECENT AREA IN WARD NO.133 UNDER BR.XV
INSTALLATION OF LED LIGHTING ARRANGEMENT FOR PROPER ILLUMINATION SYSTEM AT THE PUMP HOUSE AND PUMPING STATION COMPOUND WITH OTHER ALLIED WORKS AT DHAPA LOCK DRAINAGE PUMPING STATION.
Contractual arrangement for attending any type of fault along with routine up keeping of HT and LT electrical network at Jinjira Bazar DPS under GRBU(for 5 Months).