Loading…
Loading…
15 results • Recent activity
Construction of 9 nos. FOBs between Pandoh to Manali section of NH-21 (Now NH 03) from km. 221.305 to km. 309.345 under EPC Mode in the state of Himachal Pradesh.
Appointment of SafetyConsultant for Construction of 4L Kaithlighat Shakral(Shimla Bypass PkgI Km128.835 Km146.3) and 4L Shakral Dhalli(Shimla Bypass PkgII Km146.3 Km156.56 and Shimla connectivity from Km0 Km0.725) in the state of HP onHAM mode.(3rdCa
Construction of 6 Nos. Foot Over Bridges (FOBs) on Parwanoo to Solan section of NH-22 (Now NH- 05) from Km. 67.000 to km 106.139 in the state of Himachal Pradesh
CS for SC for Operation and Maintenance of 4Laning of Parwanoo-Solan section from Km67 to Km106.139 on EPC including AE services for Construction of 2Viaducts at Km88.44(LHS)andKm103.32(LHS) atParwanoo-Solan section of NH05 in State of HP onEPC(2Call
RFP for Appointment of Safety Consultant for 4L Sihuni to Rajol from km 51 to 72 (Design Length 18.45km) (Pkg IIA) and 2L PS Padhar to Bijni from km 180 to km 202.815 (Design Length 19.05km) (Pkg VA) of Pathankot-Mandi NH-154 under NH(O) in HP on HAM
RFP for Construction of 5 No. FOBs between Solan to Kaithlighat section of NH22 (Now NH 05) from Km. 106.139 to Km. 129.050 under NHDP Phase III of EPC mode in the state of Himachal Pradesh.