Loading…
Loading…
15 results • Recent activity
RFPForAppointment OfSafetyConsultants ForDPRStage 4L Rajol Thanpuri (Km72to85.135)PkgIIB, 2LPSParourChauntra (100.84to140.625)PkgIII, 2LPSChauntraPadhar (140.625to180)PkgIV, 4LPSBijniMandi (202.815to208)PkgVB of Pathankot Mandi NH154 in HP (2nd Call)
RFP For Appointment of Safety Consultants for Under Construction Projects i.e. 4L of Solan-Kaithlighat Km 106.139 to Km 129.050 of NH-05 in HP, 4L of End of Pinjore bypass-Nalagarh Km 4.200 to km 35.397 of NH-105 in Haryana and HP on EPC Mode.
RFPFor AppointmentOf SafetyConsultants ForDPRStage 2LPS ShimlaShalaghat (DesignCh0to27.5, DesignLength27.5km, ExistingLength30km)Pkg1, 4,2LPS ShalaghatNauniChowk (DesignCh27.5to58.47, DesignLength30.97km, ExistingLength 48km)Pkg2 ofNH205state HP(2Cal
Consultancy services for Supervision Consultant for Operation and Maintenance of Up gradation of Kullu-Manali section of NH-21 (new NH-3) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the state of Himachal Pradesh under NHDPPhaseIVB
RFP For Appointment of Safety Consultants for DPR Stage 4L Rajol Thanpuri(Km72to85.135)PkgIIB, 2LPS Parour Chauntra(100.84to 140.625)PkgIII, 2LPS Chauntra Padhar(140.625to180)PkgIV, 4LPS Bijni Mandi(202.815to208)PkgVB of Pathankot Mandi NH154 in HP.
Construction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.