Loading…
Loading…
102 results • Recent activity
Erection and repairs of the existing constructed rest shelters along Baltal axis and enroute from Sangam to Panjtarni including dismantling of the same after Yatra.
Carriage, assembling of Camp Director Hut and Addl/Deputy Camp Director with attached washroom before Yatra including cost of dismantling and strengthening after Yatra at Brarimarg and Sangam
Carriage and assembling of PPGI sheet 16 rooms of size 3.45 m x 3.45 m, Reserve Sheds( 03 Rooms) and RFID shed 01 room , Shops 03 nos., Cloak rooms 6 Nos. before yatra and dismantling and safe storage after Yatra at Holy Cave and Lower Holy Cave
Assembling of SASB Staff Huts, Base Hospital, Medical and Police Officers Hut, Meeting Hall, JK Bank Hut an CGI sheet sheds for BSNL, kitchen, shoe rack at Holy Cave before start of Yatra and its dismantling and safe stacking after conclusion of Yatr
Assembling of dismantled portion of Base Hospital including finishing works before Yatra including dismantling of the same and safe stacking after the culmination of Yatra at Lower Holy cave.
Renovation of damaged outsource rooms at Panjtarni.