Loading…
Loading…
Found 7 active tenders
7 results • Latest
Construction of 0.11 lac gallons capacity OHT with sump at Industrial Estate Mehmoodabad Dooru
Earthwork excavation by Mechanical means including disposal of excavated earth upto the site as directed by the Engineer Incharge at site.
Construction of 0.11 lac gallons capacity OHT at Industrial Estate Mehmoodabad Dooru.
Earthwork excavation by Mechanical means including disposal of excavated earth upto the lead of 50 mtr.
CONSTRUCTION OF PACCA RCC NALLAH OF THE WASTE WATER OF INDUSTRIES LOCATED AT IID CENTRE GOVINDSAR KATHUA FOR ITS DISPOSAL TO MAGGAR KHAD
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Conducting Pre-Feasibility, preparation of DPR for the Establishment, Bid Transaction Advisory Services and its allied works to establish the CETP Project at Industrial Estate Kathua (02 Nos), Industrial Estate Billawar (01 No.) Industrial Estate Bir
Conducting Pre-Feasibility, preparation of DPR for the Establishment, Bid Transaction Advisory Services and its allied works to establish the CETP Project at Industrial Estate Kathua (02 Nos), Industrial Estate Billawar (01 No.) Industrial Estate Birpur Samba (01 No.) & Industrial Estate Gran Morh Reasi (01 No.) managed by J&K SICOP
CREATION OF INFRASTRUCTURE FOR AD HANDICRAFTS OFFICE AND AD HANDLOOM OFFICE KATHUA
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:4:8 or leaner mix (i/c equivalent design mix)
RATE CONTRACT for Upkeep of existing Industrial Estate on daily basis by way of Clearance of Choked Drains Removal of Mulba bushes Cleaning of roads including Repair Installation of Street Lights at Industrial Estate SICOP RAJOURI
Removal of unhygienic materials (so classified by the site engineer) from designated sites/drains & stacking the same on the road side as per direction of Engineer-in-charge including Jungle Clearance on both sides of Drains.