Loading…
Loading…
2,321 results • Recent activity
Construction of 09 nos. RCC Isolation stopping, 03 Nos. Brick made Isolation stopping, 78 Nos. ventilation stoppings in 6 East and 5 East proposed LHCM depillaring panel and 01No Air Crossing in 38L 0 Dip of Massan Combined seam at Shiwani UG Mine,
White washing along the travelling roadway, belt roadway and other galleries in the 30LW and 21LE Dip Panel of Seam-III and Seam-II and for cleaning the travelling roadway at the 30LW depillaring panel of Seam-III of Pandavpara Mine.
Construction of 09 Nos. Sealing of isolation stoppings in between T-21 A1 and T-21 A2 Sub - Panels at Seam-V Jhilimili Mine.
Construction of 33 Nos. Ventilation Stopping at 24LW Panel in Seam - II of Katkona 1 and 2 Incline.
White washing with lime to give an even shade. Old work (one or more coats) from haulage roadway, travelling roadway, belt roadway and CM Panel in Seam - IV B and Seam-V of Jhlimili UG Mine.
A.M.C. for comprehensive civil repairing works for RBs and NRBs at Urjanagar township of Bhatgaon Area.