Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC MAIN ROAD JARHI SURAJPUR DISTT SURAJPUR C G 497235 | SURAJPUR | CHHATTISGARH | 497235 | ₹21.3 L Quoted ₹18.1 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹19.5 LRejected-Finance C O SHRI SUKHDEV SINGH VILL PIRAULI PO PIRAULI KISHANPUR DISTT MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | ₹19.5 L | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹20.3 LRejected-Finance M 1154 WARD NO 07 KAPILDHARA COLONY POST BIJURI DISTT ANUPPUR M P PIN 484440 | BIJURI | ANUPPUR | MADHYA PRADESH | 484440 | ₹20.3 L | L3 | Rejected-Finance L3 Bidder |
| 4 | L4₹20.6 LRejected-Finance | ₹20.6 L | L4 | Rejected-Finance L4 Bidder |
| Sl No | Description | Qty | Unit | service idea L3 | NAIMUDDIN ANSARI L4 | Gurucharan Singh L2 | M/S ARYA ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00Description of Work | |||||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 24.3 | Cum | 619 ₹15,041.70 | 626.9 ₹15,233.67 | 593.24 ₹14,415.73 | 545 ₹13,243.50 |
| 2.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 14.85 | Cum | 1,561 ₹23,180.85 | 1,578.86 ₹23,446.07 | 1,494.1 ₹22,187.38 | 1,371 ₹20,359.35 |
| 3.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 ) | 5.67 | Cum | 5,500 ₹31,185 | 5,560.35 ₹31,527.18 | 5,261.82 ₹29,834.52 | 4,830 ₹27,386.10 |
| 4.00 | Reinforcement for RCC work including straightening, cutting ,bending placing in position and binding all complete. (Analysis rate) | 3,092.13 | Kg | 91 ₹2.8 L | 92.67 ₹2.9 L | 87.7 ₹2.7 L | 85 ₹2.6 L |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses,
plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth
level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 ( Sl No.- 13 of GMSOR 2018 ) | 109.62 | Cum | 9,593 ₹10.5 L | 9,698.08 ₹10.6 L | 9,177.43 ₹10.1 L | 8,425 ₹9.2 L |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 594 | Sqm | 369 ₹2.2 L | 374.56 ₹2.2 L | 354.45 ₹2.1 L | 325 ₹1.9 L |
| 7.00 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 801 | Sqm | 348 ₹2.8 L | 352.96 ₹2.8 L | 334.01 ₹2.7 L | 310 ₹2.5 L |
| 8.00 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 184.07 | Cum | 240 ₹44,176.80 | 241.07 ₹44,373.75 | 228.13 ₹41,991.89 | 210 ₹38,654.70 |
| 9.00 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 184.07 | Cum | 173 ₹31,844.11 | 175.43 ₹32,291.40 | 166.01 ₹30,557.46 | 153 ₹28,162.71 |
Tender Value
Refer Docs
EMD Value
₹36,700
Closing Date
21 Jan 2026, 5:00 pmClosed
GM (Oprn.), Baikunthpur Area
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 09 Nos. Sealing of isolation stoppings in between T-21 A1 and T-21 A2 Sub - Panels at Seam-V Jhilimili Mine.
2026_SECL_350962_1
SECL/BKP/GMO/25-26/JML/eT/27 Dated 09.01.2026
Open Tender
Civil Works - Others
60 days
Jhilimili Mine
Please refer Tender document
4 documents required · 4 mandatory
₹36,700
19 Feb 2026
10 Jan 2026
22 Jan 2026
11 Jan 2026
21 Jan 2026
11 Jan 2026
11 Jan 2026 - 14 Jan 2026
Description of Work
Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 )
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018)
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 )
Reinforcement for RCC work including straightening, cutting ,bending placing in position and binding all complete. (Analysis rate)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 ( Sl No.- 13 of GMSOR 2018 )
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 )
12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018)
Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018)
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018)
Lead for transportation of materials for every 15 mtr or part by head load for 50 m.(02 leads) ( Sl No.- 7 of GMSOR 2018)
White washing in underground galleries for uneven surface (A) Single Coat. ( Sl No.- 15 of GMSOR 2018)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 1.37 MB
Tendernotice_3.pdf
PDF • 0.72 MB
BOQ_363730.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid