Loading…
Loading…
2,418 results • Latest
Capacitor Bank: 3.3 kV (± 10% ), 50 Hz (± 3% ), 3-phase system Rating: 75 kVAr, Capacitor Bank: 11 kV (± 10% ), 50 Hz (± 3% ), 3-phase system Rating: 150 kVAr
Preparation of pumping sheds during monsoon at Chirimiri OCM.
Providing and placing cement bags filled with earth as and when required at Chirimiri OCM during mansoon period.
Drilling 03 no.s of boreholes in Katkona Sub Area for supplying water for colony, Mainmagzine, CM machine
Supply, installation, testing and commissioning of Video Conferencing systems(VC End equipment+ 98, Supply, installation, testing and commissioning of Video Conferencing systems(VC End equipment+ 86
Providing and fixing of 05 Nos borwell including its allied works nearby mine-affected villages of Kusmunda Area.
Custom Bid for Services - Facilitating power through two nos vehicle mounted DG set with welding plant for 365 days for pipeline welding and other auxiliary works at different places not having power facility at mines EnM KOCP Similar Category Leasing Service of DG-Set
Custom Bid for Services - Hiring of 03 nos of Pump Motor set for dewatering of Gayatri UG Mine of Bishrampur Area as per NIT Similar Category Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis)
Custom Bid for Services - Mechanical assistance for making temporary drainage or other connecting work during monsoon period at different location of mines at KOCP of Kusmunda Area Similar Category Facility Management Services - LumpSum Based Hiring of Special Purpose Mining or Earth Moving Machines and Cranes (Shift Based) Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
WHEEL SHAFT_PN_WHS_U800_30, FAN_PN_WU_F_U800_30, COWL FAN COVER_PN_WU_FC_U800_30, WORM SHAFT OIL CATCHER_PN_WSOC_U800_30, WHEEL SHAFT OIL CATCHER_PN_WHSOC_U800_30, WHEEL SHAFT END COVER_PN_WHSEC_U800_30, WORM SHAFT_PN_WS_U800_30, WORM WHEEL_PN_WWH_U800_30, WHEEL SHAFT_PN_WHS_U1000_30, FAN_PN_WU_F_U1000_30, COWL FAN COVER_PN_WU_FC_U1000_30, WORM SHAFT_PN_WS_U1000_30, WORM WHEEL_PN_WWH_U1000_30, WORM SHAFT OIL CATCHER_PN_WSOC_U1000_30, WHEEL SHAFT OIL CATCHER_PN_WHSOC_U1000_30, WHEEL SHAFT END COVER_PN_WHSEC_U1000_30
Strengthening of Entry and Exit Portions of Weigh Bridges No. 07, 09, 10 and Boom Barrier at W/B-09 at Chhal OCM, Chhal Sub-Area.(2nd Call).
Plastic Grip Seal (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6974147 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 26000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
V - Belts - Endless V - Belt for Industrial Purposes as per IS 2494, V-Belt E-358, V-Belt C-294
PROCUREMENT OF SPARES FOR SHANTHI MAKE GEAR BOX
Ball Bearing 6318 C3, Bearing 22244 CCK, Bearing 22234CCK, Bearing 2960 CV/C3
Facility Management Services - LumpSum Based - Residential; O&M of water supply work for colonies; Consumables to be provided by buyer
Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
esab "As per specification for ""Covered arc welding electrode -Basic, esab "As per specification for ""Covered arc welding electrode -Basic type AWS E 7018 Class "", with standard C4102 BEML Welding Electrode prepared and approved by BEML LTD, OFFICE OF THE ASSISTANT GENERAL MANAGER, CORPORTAE 4 millimeter 450 millimeter
Transformer Oil filtration plants (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6822152 Dated : 04-12-2025 Bid Document 1/24 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2395400 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 47908 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Staff Officer, Materials Management Office of Area General Manager, SECL, Johilla Area, Nowrozabad, District-Umaria, Madhya Pradesh, 484555 (Secl, Johilla Area) 2/24
Cleaning and Painting work of Weighbridge structure and associated poles operating at different mines of Bhatgaon Area
Shunt Trip Coil Assembly 110V DC NVCB V 0001, Direct acting type earth leakage relay heavy duty for D O VCB NVCB V 0008, Vacuum interrupter NVCB V 0013, Rectifier capacitor unit 1 ph 16 Amps 110V AC to 110V DC NVCB I 0022, Contact Element NO NVCB P 0026, Contact Element NC NVCB P 0027, Rectifier capacitor unit 15 Amp NVCB P 0034, Earth Leakage Relay NVCB P 0035, 3 Point 3 KV 3 Amps PT Fuse NVCB P 0044, Rectangular Type CBCT NVCB P 0047, 6 Point 6 KV Grade support insulator NVCB P 0051, HRC Fuse link 10 Amps NVCB P 0057, HRC Fuse link 2 Amps NVCB P 0058
Installation of 01 no. of Tubewell/ Borewell with Submersible pump near OHT Gevra Basti Village, Block-Katghora District-Korba under CSR Head of SECL, Gevra Area. (2nd call)
AEROSOL GENERATOR, MICRO PRCESSR BSD CNTRL PNL, 16X2 LCD PNL, LHS SENSOR WIRE, MANUAL CALL POINTS
Supply and installation of electro-mechanical equipments with Fabricated Tanks for ETP with Providing Boundary wall and other misc civil work near ETP site of Jagannathpur OCP under Bhatgaon Area.(Under EC Conditions)
Making shed for transformer at 400 B type Qtrs. Of Kurasia Colliery at Chirimiri Area
FLUID COUPLING, Part No.G0390, PLUMMER BLOCK WITH BUSHING FOR DISCHARGE, Part No.G07A, RELAY E L 2 5A 230VAC WITH CBCT, Part No.1902338, BREATHER, Part No.1790, LOOP TAKE UP TROLLEY FOR 1000 MM BELT CON, Part No.G1710
Mortuary Cabinet (V2) (Q2) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6292451 Dated : 09-06-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 406500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AREA GENERAL MANAGER SOHAGPUR AREA, South Eastern Coalfields Limited, STATE BANK OF INDIA, DHANPURI BRANCH, BRANCH CODE 4617, BANK IFSC SBIN0004617, BANK ACCOUNT NUMBER 10964816155 SBI DHANPURI - 3 DISTRICT SHAHDOL (Secl, Sohagpur Area) (Secl, Sohagpur Area) Splitting
BLOCK PDSTL CI 235X76X135MM GRV 55MM, CLIP HAULAGE ROPE SCREW TYP 19 22MM, LINK D DGMS W PIN COUPLING CHAIN, ACCESSORY J HOOK COAL TUB, NAIL 3IN 3 8IN MS DOG
Spirometer (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6763169 Dated : 18-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 400000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SECL BISHRAMPUR AREA Office of Area General Manager, SECL Bishrampur Chhattisgarh, COAL INDIA LIMITED, South Eastern Coalfields Limited, Ministry of Coal (Secl Bishrampur Area)
Spirometer (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Smartphone (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Stationary Storage Type Electric Water Heaters (Geyser) (V3) ISI Marked to IS 2082 (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6899485 Dated : 28-11-2025 Bid Document 1/18 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 199800 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Customized AMC/CMC for Pre-owned Products - Repair and Maintenance of Air Conditioning system installed in 07 Nos Drills of Kusmunda OCP; Repair and Maintenance of Air Conditioning system installed in 07 Nos Drills of Kusmunda OCP; Comprehensive Main..
Custom Bid for Services - Annual Maintenance Contract of Room Air Conditioners split type and Drinking Water filter cum coolers Water purifier and Water cooler without purifier installed and working at various locations of CEWS Gevra Similar Category Annual Maintenance service-AIR CONDITIONER ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2)
Making Shoulder with approved material and using vibratory roller of 80 to 100 KN static weight to meet requirement of approach road to connect PWD Road to coal stock yard at Rampur Batura OCP under Sohagpur area
Providing Embankment for protection from rainwater near caved panel B-35, B-36 at Khairaha UG Mine under Rajendra Sub Area
Custom Bid for Services - Repairing of five Nos (05) M6610A transmission applicable for BH60 Dumper Similar Category Repair and Overhauling Service
Electrical Rubber Safety Hand Gloves Class 4, Electrical Shock Resistant Safety Shoes, Electrical Rubber Safety Hand Gloves Class 1
Cotton Yarn Waste (V2) as per IS 5485 (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6906424 Dated : 02-12-2025 Bid Document 1/14 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 53393 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Annual Maintenance work in Non Residential buildings in Bhatgaon Sub Area of Bhatgaon Area. (For One year).
Custom Bid for Services - Hiring of 02 No 1000 GPM and100 Meter head Diesel Operated Pump sets along with allied components accessories for Dewatering of Quarry by pumping of water accumulated in the mines rainwater from working faces etc along with.. Similar Category Operation And Maintenance Of Water Supply Systems
Facility Management Services - LumpSum Based - Industrial; COLLECTION AND PREPARATION OF COAL SAMPLES; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Industrial; Provision of air coolers on hiring basis for different offices & service buildings of Dipka Area for up-coming summer season 2026; Consumables to be provided by service provider (inclusive in..
Sewing Machine as per IS 1610 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service, Transport Service, Handling & Transport Service, Hiring of payloader for mechanical loading of coal and Hiring of Tipper for Transportation of Coal from Sharda..
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio/Mahindra Scorpio N/Mahindra XUV 700/Tata Harrier/Tata Safari/Equivalent; The age of vehicles shall not be more than 2 years from the scheduled date of opening ..
Custom Bid for Services - Hiring of 01 no Advanced Life Support (ALS) Type D Ambulance (T1 AMB 3350 FM2point6CR BSVIpoint 2 10 plus P AC PS ABS AIS125 TYPE D or Equivalent or higher version in comparison to attached detailed technical specificatio.. Similar Category Hiring of Air Ambulance Service (Long Term Services) Monthly Ambulance Service (All Inclusive) Monthly Basis Cab and Taxi Hiring Service - Without Fuel
Work Towards Repairing of damaged sub-assemblies of Belaz 150T Dumpers as per Scope of Work.
Re-arrangement, repairing and maintenance of existing 33KV Over head feeder no. F-1, F-13 and F-16 of 132/33KV Sub Station Sub Station, Gevra Area for 120 days within duration of monsoon
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero/Mahindra Thar Roxx/Mahindra Bolero Neo or Equivalent; The age of vehicles shall not be more than 2 years from the scheduled date of opening of Tender and shall be cou..