Loading…
Loading…
2,430 results • Latest
Cleaning of kaccha drain , bush cutting and Subsidence Crack filling at surface of vindhya mine boundary area under Pinoura Sub Area of Johilla Area.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio/Mahindra Scorpio N/Mahindra XUV 700/Tata Harrier/Tata Safari/Equivalent; The age of vehicles shall not be more than 2 years from the scheduled date of opening .., Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero/Mahindra Thar Roxx/Mahindra Bolero Neo or Equivalent; The age of vehicles shall not be more than 2 years from the scheduled date of opening of Tender and shall be cou..
Annual Maintenance service-AIR CONDITIONER
Day to day repair and maintenance of Residential Qtrs at Pali Sub Area of Johilla Area (For Two Years Maintenance).
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6761138 Dated : 13-10-2025 Bid Document 1/17, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category High Mast Lighting Tower for large area with LED Flood Lighting System Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 38878340 Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 407000 Schedule 2 EMD Amount (In INR) 370000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 9 2/17 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : A subsidiary of coal India limited South Eastern Coalfields Limited, A Subsidiary of Coal India Limited, Ministry of Coal, Bilaspur Cg, Materials Management, BANK NAME : State Bank of India BRANCH NAME - SME SBI Branch, Bilaspur NAME OF BENEFICIARY- SOUTH EASTERN COALFIELDS LIMITED, SEEPAT ROAD BILASPUR ACCOUNT NO: 30285470636 IFSC CODE-SBIN0004177 All Bank Guarantees’ shall be operative preferably at Branch of the issuing bank Situated at Bilaspur (Chhattisgarh) –(Branch name to be mentioned) (South Eastern Coalfields Limited) (South Eastern Coalfields Limited)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6510672 Dated : 18-08-2025 Bid Document 1/15 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 422000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SECL GEVRA AREA` SOMM OFFICE OF THE GENERAL MANAGER SECL GEVRA AREA KORBA CHATTISGARH PO- GEVRA PROJECT PINCODE-495452 SECL Bilaspur Chhattisgarh, COAL INDIA LIMITED, South Eastern Coalfields Limited, Ministry of Coal (Secl Gevra Area) Splitting
Repair and maintenance of residential buildings on change of occupation (shifting case) at Pragati Nagar colony of Dipka Area.
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT, Conducting Non Destructive Test on vital parts of winding engine steel wire rope 35 mm Cage Suspension Gears etc and load bearing test of Cages North and South o..
Facility Management Services - LumpSum Based - GM Office and Guest House at GM Copmlex; Security Services; Consumables to be provided by buyer
ROTATING UNIT COMPLETE SET FOR PUMP MODEL NO: 250/300 GST, PART NO-ROT011100 OR EQUIVALENT
Cleaning and removing of debris in and out side the track at dumanhill siding of Chirimiri Area.
White washing, painting and minor repair work for Chhat Ghat at G.M. Complex in Chirimiri Area.
CABLE COUPLER/PLUG & SOCKET ASSY. 800 AMP, PART NO- FSV00122 OR EQUIVALENT
Calibration Services - Lux Meter; As per NIT; As per NIT; GVTC Rajnagar RO
LOTO KIT, Discharge Rod (Earth Rod) - FRP Telescopic - 33KV - With 10 s. qmm– 10 mtrs Cable
Elastomer Insulated Flexible Cables For Use In Mines As Per IS: 14494 (latest)
Facility Management Services - LumpSum Based - Providing Assistance in day to day cleaning transporting of ladder other materials and attending electrical breakdown as required for maintenance and rectification of breakdown of electrical power suppl..
Hiring of Air Conditioners and Desert Coolers - Monthly Based - Hiring of air cooler in tip top conditions with prompt repairing maintenance and operation services for the upcoming summer season 2026 for maximum period of 04 months maximum upto 31 Ju..
1BY4 INCH HOSE ASSLY, PART NO. - SE53522127, 1BY2 IN HOSE ASSY, 2800MM, PART NO. - SE535225, 1BY4 INCH HOSE ASSY, PART NO. - SE5352243, PART NO. - SE5352245, FUSE 3A, PART NO. - SE53557, SENSOR CABLE ASSY, PART NO. - SE53727, DRY CHEMICAL POWDER, PART NO. - SE53753, NON RETURN VALVE, PART NO. - SE53792, DUST CAP, PART NO. - SE53835, PILOT CYLINDER ASSY, GL, PART NO. - SE57146, SENSOR CABLE ASSEMBLY, PART NO. - SE53944, C02 CARTRIDGE, 300GM, PART NO. - SE53994, SPLICING CONNECTOR, PART NO. - SE54539, RUPTURE DISC ASSY - DCP CYL, PART NO. - SE54686, CONTROL UNIT ASSY., PART NO. - SE57110, MAIN CONTROL UNIT, PART NO. - SE571101, NITROGEN CYLINDER ASSEMBLY, PART NO. - SE57112, NOZZLE BRACKET, PART NO. - SE572161, CABLE ASSY.MAIN, PART NO. - SE57234, LOCKING PIN ASSY - N2 CYL, PART NO. - SE57394, DCP CYLINDER, 15KG, PART NO. - SE57512, CO2 CARTRIDGE, 200GM, PART NO. - SE57218, 400GM, PART NO. - SE539941, FUSE HOLDER, PART NO. - SE53675, PILOT CYLINDER ASSEMBLY, PART NO. - SE573222, TEFLON BUSH, PART NO. - SE543351, CONICAL NOZZLE, PART NO. - SE53508, 1BY4 INCH HOSE ASSY., M10 BOSS, PART NO. - SE53635, CABLE ASSLY MAIN, PART NO. - SE57253, DCP CYL ASSLY 20 KG, PART NO. - SE57111, SENSOR CLIP, PART NO. - SE54462, 3BY4 INCH COUPLER, PART NO. - SE53570, 1BY2 INCH Hose Assly, PART NO. - SE535848, PART NO. - SE5352266, NRV, PART NO. - SE53762, CYLINDER CLAMP, PART NO. - SE57491, SENSOR CABLE, PART NO. - SE53695
Voltos Make main Mechanical Fan (Rotor Shaft)
DGMS Approved Flameproof Weatherproof LED Flat Glass Light Fittings 40W 110V AC
SHOCK SUB DURAQUEST 28 PART NO 57795353
1st Stage Pinion and Gear in set with Integral Shaft 25 Part No 11and 18c 150 12, Input Shaft Oil Seal Part No 09 55 08, Output Shaft Oil Seal Part No 35 55 08, Output Shaft Part No 38 55 08, Tandem Drive Driven Drum Part No 46 55 08, 1st Stage Gear and Pinion with Integral Shaft in Set 25 Part No 11 and 18 c 55 08, Hold Back Part No4 55 08, Input Shaft Bearing Cover Part No5 55 08, Input Shaft Bearing Cap Part No6 55 08, 2nd Stage Gear and Pinion with Integral Shaft in Set Part No 22 and 26 55 08, 3rd Stage Gear and Pinion in Set Part No 30 and 36 55 08, 1st Stage Gear and Pinion with Integral Shaft in Set 25 Part No 11 and 18 c 75 10, Equalizing Gear in Set of Two Nos Part No 52 75 10, Complete Tandem Drive Driven Drum Assly Part No CA 46 75 10, Input Shaft Bearing Cover Part No 5 75 10, Hold Back Part No 4 90 10, Drive Drum Part No 46 37
PROCUREMENT OF SPARES OF REFILLING OF POL GREASE
Input Shaft Oil Seal Coupling Side 22 55, 2nd Stage Pinion Shaft and Gear in Set 35 and 36 55, Input Shaft with Integrated Pinion and 1st Stage Gear 61 and 26 55, 2nd Stage Bushing 30 55, Intermediate Shaft 42 55, Input shaft with integrated pinion and 1st stage gear 61 and 26 90, 2nd Stage Pinion and Gear in Set 35 and 36 90, 1st Stage Intermediate Shaft Bushing 30 90, Input shaft oil seal Coupling side 22 90, 2nd Stage Intermediate Shaft 42 90, Hold Back GB 65, Tandem Driven Drum 650 mm Dia. for 1000 mm Belt Width G 07 10, Input shaft oil seal Coupling side 150 22, 1st Stage Intermediate Shaft 2nd Motion Shaft 150 31, 2nd Intermediate Shaft Bushing 150 42, Input shaft with integrated pinion 1st Motion Shaft 150 61, Tandem Driven Drum 650 mm Dia for 1200 mm Belt Width G 07 12
Calibration Services - Sound meter; as per NIT; as per NIT; as per NIT(GVTC Raj RO)
Precast Concrete Pipes (With And Without Reinforcement) (V2) As Per Is 458 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), LED Batten (Q2), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 Section 3) (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6998317 Dated : 22-12-2025 Bid Document 1/15 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1719092.09 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 7004 Schedule 2 EMD Amount (In INR) 15016 Schedule 3 EMD Amount (In INR) 377 Schedule 4 EMD Amount (In INR) 1880 Schedule 5 EMD Amount (In INR) 7461 Schedule 6 EMD Amount (In INR) 1419 Schedule 7 EMD Amount (In INR) 1226 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 2/15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Bhatgaon SO MM, Office of the General Manager SECL Bhatgaon Area, Material Management division, BHATGAON AREA SECL, PO: Bhatgaon Colliery, Dist: Surajpur(CG) 497235, South Eastern Coalfields Limited, A Subsidiary of Coal India Limited, Ministry of Coal, Bilaspur Cg, (South Eastern Coalfields Limited) Note – SFMS Confirmation shall be as mentioned in ATC and Operable at Bilaspur. (Secl, Bhatgaon Area)
Vehicle Safety Flag Mast (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7071423 Dated : 13-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 495600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing Firefighting fitment with First Aid Hose reel system along with rooftop tank at SECL Regional Hospital under Bhatgaon Sub Area of Bhatgaon Area.
Bus Hiring Service - Regular Basis - Local; 32; A.C. Deluxe (ACX); 36540
Diesel Bowser capacity 10 KL with BS VI/latest pollution norms & standard
JAW CLUTCH DRIVING PART AND DRIVEN PART PART NO 444555, P BY BLOCK ASSY DRIVE DRIVEN DRUM PART NO 575510, P BY BLOCK ASSY FOR DISCHARGE DRUM PART NO 655510, P BLOCK ASSLY FOR TAIL TAKEUP DRUM PART NO PBTDPBTUD5510, HAND OPERATED WINCH IN SET PART NO HW5510, BED FRAME FOR 1X55KW PART NO BF5510, ROTATING BUSH BK PART NO VB2055, ROTATING BUSH CK PART NO VB225575, ROTATING BUSH DK PART NO VB2455, ROTATING BUSH FK PART NO VB2855, INPUT SHAFT BEARING COVER PART NO 555, INPUT SHAFT BEARING CAP PART NO 655, INPUT SHAFT OIL SEAL PART NO 955, INPUT SHAFT SPACING WASHER PART NO 1355, INPUT PINION SHAFT BEARING PART NO 1455, 2ND INTERMEDIATE SHAFT BEARING PART NO 2755, OUTPUT OIL SEAL PART NO 3555, ROTATING BUSH GK PART NO VB3255, HOLD BACK PART NO 45510, INPUT SHAFT OIL SEAL PART NO 975, 1ST STAGE GEAR AND PINION WITH INTEGRAL SH PART NO 1118C75, INPUT PINION SHAFT BEARING PART NO 1475, 1ST INTERMEDIATE SHAFT BEARING PART NO 197510, 2ND INTERMEDIATE SHAFT BEARING PART NO 277510, OUTPUT SHAFT OIL SEAL PART NO 3575, 3RD STAGE GEAR AND PINION IN SET PART NO 30367510, EQUALISING GEAR IN SET OF TWO NOS PART NO 527510, INPUT SHAFT OIL SEAL PART NO PART NO 990, INPUT SHAFT PART NO 1090, 1ST STAGE GEAR AND PINION IN SET PART NO 1118C90, INPUT PINION SHAFT BEARING PART NO 1490, OUTPUT SHAFT OIL SEAL PART NO 3590, JAW CLUTCH DRIVING AND DRIVEN PART NO 444590, P BLOCK ASSY FOR TAIL DRUM PART NO PBTD90, LOOP TAKE UP TROLLEY 90 KW VISHWA MAKE PART NO LTT90, HAND OPERATED WINCH IN SET LH AND RH PART NO HW9010, ROTATING BUSH BK PART NO VB2090, ROTATING BUSH CK PART NO VB2290, ROTATING BUSH DK PART NO VB2490, ROTATING BUSH FK PART NO VB2890, ROTATING BUSH GK PART NO VB3290, FIRST INTERMEDIATE SHAFT BEARING PART NO 1990, SECOND INTERMEDIATE SHAFT BEARING PART NO 2790, EQUALISING GEAR IN SET OF TWO NOS 52 PART NO 5290, HOLD BACJK PART NO 490, OUTPUT SHAFT BEARING PART NO 3790, EQUALIZING GEAR GUARD PART NO 5190, P BY BLOCK ASSY FOR TANDEM DRIVE DRUM PART NO 579010, PLUMMER BLOCK WITH BUSHING FOR DISCHARGE PART NO 6590, P BY BLOCK ASSEMBLY FOR HT SNUB DRUM PART NO 669010 Bid Details 2/45
COMPLETE DEFLECTOR DRUM ASSY 75KW PART NO CA637510, COMPLETE LT SNUB DRUM ASSY 75KW PART NO CALTSD7510, COMPLETE TANDEM DRV DRVN DRUM ASSY 650MM PART NO CA469010, COMPLETE HT SNUB DRUM ASSEMBLY PART NO CA629010, COMPLETE TAIL DRUM ASSEMBLY PART NO CATD9010, COMPLETE TAKE UP DRUM ASSEMBLY PART NO CATUD9010
Mechanical Belt Fastening System (Q4) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
First Intermediate Pinion Hold Back Pinion for KCN450 Gearbox Part no KCN450HBP402, Second Intermediate Pinion fitted with Second Intermediate Wheel for KCN450 Gearbox Part no KCN450IP302IW403, Output Shaft for KCN450 Gearbox Part no KCN450OPS202, Output Wheel for KCN450 Gearbox Part no KCN450OPW303, Hold Back for KCN450 Gearbox Part no KCN450HB480
Mine Development & Operations Service(MDO) - Under Ground Mining; Coal
AMC for water supply pipe line and sanitory installations of residential quarters of Surakachhar,Balgi and Banki Township
(A)Repairing of 11 Nos of 33 KV AB Switches Installed at Churcha Mine (RO) (B) Providing and Fixing of 02 Nos 3.3 KV AB Switch for Roop Top Solar Plants installed at SAM Office 50 KW and Regional Hospital 100 KW
Toyota Innova Hycross, Toyota Hycross Innova
Belt Jointing work of Longitudinal (through cut repairing) for 2000/1600 mm steel cord belts, CHP Phase-1 and CHP Phase-II, KOCP
Providing hard ground base on surface for assembling Continuous Miners (C.M. Machine) parts at Damni UG Mine under ABD Sub Area
Facility Management Services - LumpSum Based - Maintaining the tar ponds water pond potable water supply fire water supply tar tanks BOD Section Utility section cleaning the drain lines for averting the water pollution Collection of samples of Tar ef..
Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 (Q3), Non - Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), Piano Type Modular Domestic Electrical sockets - IS 1293 (Q3), Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), DOL starter (Q3), Voltage regulator for domestic fans (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
RA process. Fujifilm CR X- Ray Film, Make - Fijifilm, Size 8x10 Inch ( 10 packet ), Delivery Days Fujifilm CR X- Ray Film, Make - Fijifilm, Size 11x14 Inch ( 10 packet ), Fujifilm CR X- Ray Film, Make - Fijifilm, Size 14x17 Inch ( 30 packet )
Ratchet Type Torque Wrench (Q3)
Erection of Electrical Pole for Mesh Earthing with Lightning Arrestor Shielding of Weigh bridge and Lightning Arrestor for Boom Barrier and Its allied work installed at different collieries of Hasdeo Area.
Malma Cleaning, removal of debris , silt from sump Sector A (Extension)/Sector-F at Rajnagar OCM.
Providing 2 Nos. temporary sheds with platform for switches and pumps during (shifting during monsoon) at Ambika OCP.