Loading…
Loading…
2,219 results • Recent activity
AMC of the Air Conditioning System for cooling in 04 nos. Water Sprinklers (02 nos. BWS 70 and 02 nos. WS 28-2), 03 nos. BD355 Chain Dozers, 02 Wheel Dozers, 07 nos. Crane and 02 nos. Motor Graders, 02 Tyre Handlers, for a period of 365 days.
Cleaning of spilled slack coal/muck below underground bunker at Rajnagar RO Colliery of Hasdeo Area
Shifting of face pump, pump starter, cables and extension of sunction and delivery pipe line in working district of 5/6 Incline (8A2 seam) at Rajnagar RO Colliery of Hasdeo Area
Dismantling, transportation of haulage track line of old working of seam A to seam C for installation at Kurja UG Mine
Installation of 1000mm belt conveyor in proposed LHCM Panel 23LN,15LN and Main Dip in seam A at Kurja UG Mine of Hasdeo Area
Roof and side dressing and stacking the dressed materials upto a distance 50m long belt roadway, haulage roadway and return roadway of 24LS and 28LS LHCM panel in seam C at Kurja Sheetaldhara UG Mine.