Loading…
Loading…
10,295 results • Latest
DEN/South/SBC sec : Salem - Bengaluru section : Proposed construction of RUB in lieu of LC No. 58 at km 85/800-900 by RCC box between Dharmapuri (DPJ) - Palakkodu (PCV) stations in ADEN/DPJ sub-division. RCC box size is 1 x 7.0 x 4.50m (Barrel length = 13.7m) by rolling/launching method in ADEN/Dharmapuri sub- division. Maintenance period is 4 years
DEN/South/SBC sec : Proposed construction of PF 2 and 3 (Precast wall) for a length of 560 mtrs and 10.50mtr width and platform shelters (10.67 mtr width) at Shantigrama (SIGA) in Chikka Banavara - Hassan section, under ADEN/Kunigal subdivision. Maintenance period is 6 months
DEN/South/SBC Section: SW I : Bengaluru - Salem Section: Proposed provision of tactile tiles (Divyang facilities) at karmelaram (CRLM), Banaswadi (BAND), Hebbal (HEB), Heelalige(HLE), Kelamangalam (KMLM), Karuvalli (KVLR), Marandahalli (MZU), Palakkodu (PCV), Periya Naga Thunai (PRNT), RYC (Rayakkottai), SZV (Sivadi), Toppur (TPP), Muttampatti (MPC) and Semmandappatti (SMDT) (Total 14 stations), under ADEN/Dharmapuri sub-division. SWII: Proposed improvements to tactile path way (Divyang facilities) at Channarayapatna (CNPA), Kunigal (KIGL), BG Nagar (BGNR), D Samughravalli (DSVS), Hirisave (HISE), Nelamangala (NMGA), Shantigrama (SIGA), Solur (SOLR), Tasa (TASA) and Yediyuru (YY) Stations, under ADEN/Kunigal sub-division. Maintenance period is 6 months
DEN/South/SBC sec : Proposed Foot over Bridge (FOB) at Shantigrama (SIGA) station of Hassan - Bangalore section under ADEN/Kunigal subdivision. Maintenance period is 12 months
DEN/South/SBC sec : Salem - Bengaluru section : Proposed construction of RUB in lieu of LC No. 48 at km 73/900-74/000 by RCC box between Dharmapuri (DPJ) - Palakkodu (PCV) stations in ADEN/Dharmapuri sub-division. RCC Box of size 1 x 7.0 x 4.50m (Barrel length = 13.7m) by rolling/launching method in ADEN/Dharmapuri sub-division. Maintenance period is 4 years
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Steel Flatasper IS2062 (Q3)
Soft Soap (V2) Conformingto IS7532 (Q3)
Laundry Service - Healthcare purpose
Miniature Circuit Breakers (MCB) for ACOperation Marked To IS/IEC60898 (Part1) (Q2)
Replacement of convetional type block instrument SGE/FM with SSBPAC to enhance the reliability of the block instrument in RRB to JRU section & JRU-BBNH of MYS division (08 SECTION). [IRPSM ID:14.03.33.26.3.52.002]
1) Mysore- Construction of SSE/Electrical/G Maintenance office for VRC colony. 2) Augmentation and upgradation of crew lobby at Mysuru
Hubballi Division: ADEN/Bellari section: Hospet(Incl) to Haddinagundu (Excl), Toranagallu (Incl) to Ranjithpur (Incl), Ballri (Incl) to Rayadurga (Incl) to Kadaridevarapalli (Incl) (ZONE-1).
Hubballi Division: ADEN/Gadag Section: Gadag (incl) to Hospet (Excl), Hospet (Excl) to Kottur (incl), Vyasa Colony (Incl) to Swaihalli (Incl), Ginigera (Incl) to Sindhanur ((Incl) , Talakal (TLKL) (Incl)-Kushtagi (KHTI) (Incl) (ZONE-2).
Hubballi Division: ADEN/Central/Jurisdiction-Annigere(NGR) (Excl)-Gadag (GDG) (Excl)-Badami(BDM) (Incl) (ZONE-4A).
Hubballi Division: ADEN/Vijayapura Jurisdiction: Bagalkot (BGK) (Incl)-Kajjidone (Incl)- Basavanabagewadi Road (BSRX) (Incl) to Badami BDM (Excl) (Zone-3/1A)
Hubballi DIvision-ADEN/CLR (Castlerock) juridiction -Londa (LD) (Excl) to Vasco-da- Gama(VSG) (Incl)(Zone-6)
Hubballi Division: ADEN/Vijayapura/Jurisdiction-Hotgi(HG) (Excl)- Basavanabagewadi Road (BSRX) (Excl) (ZONE-3/A).
Hubballi Division-ADEN/BGM(Belagavi) juridication-Alnawar (LWR) (Excl) to Miraj (MRJ) (Excl) (Zone-5).
Hubballi Division: ADEN/Central/Jurisdiction-Karjagi (KJG) (Incl)- Hubballi(UBL) (Excl)-Annigere (NGR) (Incl) (Zone-4/1A)
Supply, installation and commissioning & maintenance of automatic fire detection cum suppression system (high pressure water mist system) for LHB Power Car and Pantry Car coaches as per RDSO SPEC. NO. IS/RDSO/CG/S/22001 along with Amendment -1 issued vide RDSO letter no. MC/ACF/Fire Supprn/PC dated 09.09.2024.Packing instruction:PI042 Ver-1.0(POWER CAR-2 SET AND PANTRY CAR-2 SET)
HALOBETASOL AND SALICYLIC ACID NOT LESS THAN 15ML
ARX-Clot Microlab Cuvette (Conical) 1X 1000
CALIBRATOR HbA1C REAGENT CALIBRATOR FOR [CALIBRATOR HbA1C REAGENT CALIBRATOR FOR COBAS C311 OF 3 X 2 ML TESTS KIT]
Injection Somatropin in cartridge/prefilled pen of 4/5/15/18/36 IU or similar (Somatropin Human Growth Hormone Recombinant injection pen device containing 5 mg to 15 mg per 1.5 ML or equivalent
INSULIN ASPART 100 IU INJECTION 3ML CARTRIDGE
MESALAMINE/ MESALAZINE 1 GM GRANULES / SACHETS
Field Coil 64 V for Starter Motor
BIMATOPROST WITH TIMOLOL EYE DROPS 3ML
HUMAN NEUTRAL INSULIN 100IU PER ML 3ML CARTRIDGE
Fixing arrangement of stainless steel dust bin assembly to RDSO Drg. No. CG- 13031 alt.Nil, along with all sub components (1) SS dust bin assembly to RDSO Drg. no. CG-13021 alt.1 (2) Fixing bracket assembly to RDSO Drg. no. CG-13029, alt.Nil (3) SS dust bin seat to RDSO Drg. no. CG-13030 alt.Nil (4) Fixing bracket to RDSO Drg. no. CG-13032 alt.Nil. Material to Grade-SS 304.
Height adjustable Chair with a minimum seat height of 750 mm
JOINTLESS GROOVED COPPER CONTACT WIRE 107 SQMM. MADE OUT OF CONTINUOUS CAST COPPER WIRE RODS AS PER RDSO SPEC. : TI/SPC/OHE/CW/0971 and STR: TI/STR/017/ Rev 02 or LATEST.
PARACETAMOL NOT LESS THAN 325MG WITH DICLOFENAC 50MG TAB