Loading…
Loading…
6,830 results • Recent activity
Supply, Installation and commissioning of modular stacking system for wheel shop. Detail specification as per Annexure enclosed.
Set of canteen items, Set consists of 3 items as given below:
Supply, installation, testing, and commissioning of an IoT-based Smart Water Level Monitoring and Management System for the Overhead Tank (OHT), including all necessary field sensors, control units, communication modules, display units, wiring, accessories, and software integration for real- time data acquisition as per annexure enclosed.
FRONT PLATE (SUB ASSEMBLY) for Schaku Coupler
Supply of EN 15152, IS 2553-1 & 2, UIC 651, UIC 566/EN 12663 Compliant Impact Resistant wind shield for Aerodynamic Cabs of modified WAP- 5 locomotive as per CLW Spec No CLW/MS/3/027 ALT- 6 and CLW Drg . no. 1211 -01.230- 005.
Supply of EN 15152, IS 2553-1 & 2, UIC 651, UIC 566/EN 12663 Compliant set of glasses for Aerodynamic Cabs of modified WAP- 5 locomotive as per CLW Spec No CLW/MS/3/027 ALT-6 , set consists of 3 items as given below: