Loading…
Loading…
5 results • Latest
Roof Top Rain Water Harvesting and artificial recharge to ground water at Indus Mahavidyala
Supply of Chemical Test Kits for analysis of water sample at Divisional Chemical and Hydrological Laboratory DC and HL, Burdwan and Regional Chemical and Hydrological Laboratory RC and HL, Suri, Birbhum for the financial year 2025-2026
Spectroquant FluorideTest Kit. Merck : 1.00822.0250, 250 ml.
Supplying and installation of systronics microcontroller photometer with Na,K filters and compressor type 128 including transportation charge
Supplying & Installation of Systronics Microcontroller Photometer with Na,K filters and compressor type 128, including transportation charges etc.
16 Nos Exploratory cum Test wells at 16 Mouzas under 8 different GPs of Block Labpur in the District of Birbhum under The Executive Engineer Agri-Irrigation S.W.I.Division No II, BURDWAN under Core Sector Program during the Financial Year 2025-26
Drilling of bore hole in DTH process through any kind of soil and rocks in overburden suitable for lowering and fitting,fixing of 125 mm. internal dia . Casing pipe (Departmental supply) upto 1 metre depth beyond overburden and subsequently 115 mm. dia. boring through any kind of rocky formation upto a total depth of 50 metre in case of dry drilling may be extended upto 75 metres including all other works necessary for boring as per direction of E.I.C. (Rates are inclusive of all materials necessary for drilling work). ( a) For depth upto 50 metres (16 Nos. x 50 M)
Annual Comprehensive Maintenance Contract AMCof all Computers and Peripherals for the office under the control of Superintending Geologist Geological Circle under SWID for the period of 2025 26