Loading…
Loading…
231 results • Recent activity
Agency should submit the RCC Design of work and take approval of same from Executive Engineer Nanded before the start of work It will be responsibility of the contractor to make arrangement of Watch and Ward for all the material supplied till complet
1. Road widen 3.50 to 5.50 metal width 2. Providing GSB for road widen portion . 3. Providing WMM for road widen portion 4. Providing and laying 100 mm thick DLC for 5.50 m metal width 5. Providing 200 mm thick PQC
MIDC has developed 95.64 Hectors of I.A. at Parbhani. The Parbhani I.A. is situated on Parbhani Nanded state highway at a distance of 3.00 km. from Parbhani Railway Station. in this work Increasing compound wall height of water work premises is inclu
Strengthening and repairing of existing raw water rising main and Jackwell.
Waluj Centralized Water Supply scheme. Replacement of bowl assembly, 2000 KVA transformer AND misc. works at Jack well Brahmgavan
Repairs and Strengthening of Sump wall at HSR Shendra and providing anti-pigeon net at WTP Khodegaon.