State Plan 202425 Electrical work Pothanicad Panchayath Supply Erection and Commissioning of one CF pump set having a discharge of 23 Lps against a total head of 70 mtr and one CF pump set having a discharge of 7.5 Lsp against a total head of 6
DEPOSITARWSS to ManjalloorNew Pipe laying work for the extension of distribution network under Chakkippara at Manjalloor Panchayath Pipeline Work
State Plan Optimization of production and transmission 2024 2025 State Plan 2024 2025 Supply Erection commissioning of centrifugal pump set 32m3 hr 1450rpm154 m Head at Manjalloor WTP ManiyathadamGeneral Civil Work
DEPOSIT Amballoor Panchayath Supplying and Laying 63mm PVC Pipe 300 m for Malayaparambu at Pallimukku Thondilangadi Road Ward 15 Pipeline work
DEPOSITUWSS to KothamangalamReplacingOldPipelineatMinipadyOlimalaRoadReach 2GeneralCivilwork
DEPOSIT CRIF PWD Urgent interconnection of the damaged 200mm and 250mm AC pipes with the newly laid 200mm and 300mm DI pipes at Veliyanad in Edakkattuvayal Panchayath Pipeline Work
Deposit work at Ramamangalam panchayath Replacing damaged 25mm GI pipe along Pathikal Karimbanalthadam road Pipeline Work
DEPOSIT RWSS to Edakkattuvayal Replacing 90mm PVC pipe near Veliyanad school related to the CRIF work Pipeline Work
JJM- WSS to Edamalakkudy Panchayath in Idukki District- Design and Construction of 0.25 MLD WTP,Clearwater Sump Cum Tank at Paarakudy
JJM- WSS to Edamalakkudy Panchayath in Idukki Dstrict- Design and Construction of Raw water Pumping Main, WTP, Clear Water Sump Cum Pump House Clear Water Pumping Main, GLSRs, Distribution Lines and Providing FHTCs at Parappayar