Loading…
Loading…
15,337 results • Latest
CONSTRUCTION OF CULVERT NHO AB MAJEED SHEIKH and GH RASOOL SHEIKH . PYTT HALQA ,- HEINGH BLOCK HARDABOORA SCHEME,- ADP (PRI) FY,- 2026-27
FENCING OF GRAVEYARD AT HAJIPORA. PH II BLOCK HERMAN
FENCING OF HERPORA GRAVEYARD AT KANHAMA
C/O Lane from M/R to Masjid Shareef via H/O Yousuf Sheikh, Wangipora and c/o concrete lane from M/r to tangdar at wangipora BLOCK HERMAN
CONSTRUCTION OF DRAIN WITH IRON GRATING AND PATH FROM MAIN ROAD TO GH AHMAD DAR AND OTHERS. PYTT HALQA ,- GOIGAM BLOCK HARDABOORA SCHEME,- ADP (PRI) FY,- 2026-27
C/O LANE FROM M/R TO H/O REYAZ SHEIKH AND OTHERS AT MUKDAM MOHALLA HAJIPORA block hermain
cC/O LANE FROM H/O ABDUS SALAM DAR TO H/O NAZEER MANTOO AT UMERABAD COLONY KANHAMA block hermain
BEAUTIFICATION OF ZIYARAT SHAREEF TARHAMA HAZRAT SYED KHALIL RA PYTT HALQA,- TARHAMA BLOCK ,- HARDABOORA SCHEME ADP (DDC) FY,-2026-27
Construction of Stair Path with Side Drain from H/o Nasir Ahmad Sheikh to h/o Ab. Gani Lone, Fresthar ADP (PRI, 2026-27,BLOCK BARAMULLA)
Improvement of Panchayat Ghar by making Washroom functional with RO facility and propper Electrical work at Fresthar ADP (PRI, 2026-27,BLOCK BARAMULLA)