Loading…
Loading…
68 results • Recent activity
Construction of interlocking road 235 mtr at second stage compound of ram janki pump canal block badhokhar khurd distt banda
Construction of CC road 86 mtr. and interlocking road 95 mtr. at first stage compound new ramjanki Pump canal block badhokharkhurd Distt Banda
PROVIDING LAYING AND JOINTING OF AC PRESSURE PIPE BY MAZZA PROCESS OF 900 MM DIA 1.88 KM FOR MAIN CANAL EXTENDING FROM THE SECOND STAGE AND 350MM DIA. 1.50 KM FOR GHAZIPUR MINOR CLASS 20 AS PER IS CODE 1592 2003 AND IS CODE 6530 1972
construction of CC lining work reach from 1.500 km to 1.785 Km of total 285 mtr in main canal of gurha pump canal gram gurhakalan block naraini distt banda
construction of CC lining Reach From1.785 to 2.065 Km 280.00 mtr total in main cana to basrahi minorl at Gurha pump canal block naraini distt banda
construction of CC lining Reach From 2.896 Kulaba no 17 to 3.171 Km Kulaba No 19 275.00 mtr total in main canal at Gurha pump canal block naraini distt banda