Loading…
Loading…
68 results • Recent activity
construction of CC lining Reach From3.441 to 3.606 Km 165.00 mtr total in main canal and syphon no 06 Both side 50 mtr total 100 mtr at Gurha pump canal block naraini distt banda
PROVIDING LAYING AND JOINTING OF AC PRESSURE PIPE BY MAZZA PROCESS OF 500 MM DIA CLASS 20 AS PER IS CODE 1592 2003 AND IS CODE 6530 1972 HAVING LENGTH 3.40 KM.FOR RAMPUR MINOR WITH ALL FITTINGS AND OUTLETS AS PER DRAWING ENCLOSED ON TURN KEY BASIS IN
Construction of RCC Retaining wall For slope protection in up Stream at first stage of singhwahni pump canal
Construction of RCC Retaining wall For slope protection in down Stream at first stage of singhwahni pump canal
construction of bridge over drain in 800 reach of main canal of new ramjanki pump canal block badokhar khurd distt banda
Providing Commissioning Erection Testing including Carriage Loading Unloading charges of main ACB LT Panel with all accessories and complete in all respect at Second stage of singhwahini pump canal block kamasin distt banda