Loading…
Loading…
68 results • Recent activity
All work of laying, commissioning and testing of A.CMAZZA pipeline 350mm reach 0.95 to 1.45 km of the water distribution system of Achreel 2 Minor under the new Singhvahini Pump.Lot-10
All work of laying, commissioning and testing of A.CMAZZA pipeline 350mm reach 1.00 to 1.25 km and MS Pipeline 350mm reach Km 0.00 to Km 1.00 of the water distribution system of Jagau Tola Minor under the new Singhvahini Pump Canal.Lot-11
All work of laying, commissioning and testing of A.CMAZZA pipeline 350mm reach 1.40 to 1.45 km, Km 1.75 to 1.85 and MS Pipeline 350mm reach Km 1.45 to Km 1.75 of the water distribution system of Jagau Tola Mr under new Singhvahini Pump Canal.Lot-12
All work of laying, commissioning and testing of A.CMAZZA pipeline 500mm reach 0.00 to 0.95 km of the water distribution system of Joravarpur Minor under the new Singhvahini Pump Canal.Lot-13
All work of laying, commissioning and testing of A.CMAZZA pipeline 500 mm reach 1.15 to 1.95 km of the water distribution system of Joravarpur Minor under the new Singhvahini Pump Canal Lot-14
construction of CC Lining Reach From 0.155 to 0.555 Km in main canal at bankat pump canal Block karwi distt chitrakoot