Loading…
Loading…
68 results • Recent activity
Shifting erection and painting of 750 mm dia 450 mm dia and 350 mm dia ms delivery pipe at new singhwahini pump canal block kamasin distt banda
Shifting of Barge, Erection and Comissioning of Barge, Planking of Barge, Foating of Barge in River, Painting of Bagre at New Ramjanki Pump Canal, Village-Ganchha, Block- Badokharkhurd, Banda UP Lot-02
C.C. lining work at madanpur pump,block- Tindwari,Banda from D-Tank to 0.300 km in main canal and from 0.200 km to 0.300 km in Gausipur minor. Lot-03
construction of CC lining Reach From 0.00 to 0.40 Km in main canal at pachim patai pump canal block mau distt chitrakoot
Construction of CC Lining work reach from 2.625 Km to 2.770 Km and 2.776 Km to 2.896 Km of Total 265 Mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
laying commissioning and painting of ms pipeline 300mm dia reach from 0.00 to 0.1665 Km three pipeline total 499.50 mtr and 630mm dia ms pipeline reach from 0.1665 to 0.2520 Km total 85 mtr in main canal at ramjanki pump canal distt banda lot 1