| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | ₹22.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹28.3 LRejected-Finance | ₹28.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹29.4 LRejected-Finance | ₹29.4 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical KATRA DISTT BANDA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹29.4 L
EMD Value
₹58,700
Closing Date
13 Sept 2024, 12:00 pmClosed
EE MLCD BANDA
EE MLCD BANDA
C.C. lining work at madanpur pump,block- Tindwari,Banda from D-Tank to 0.300 km in main canal and from 0.200 km to 0.300 km in Gausipur minor. Lot-03
2024_UPIDM_951849_3
03/MLCD/2024-25
Open Tender
Civil Works
90 days
BANDA
C.C. lining work at madanpur pump,block- Tindwari,Banda from D-Tank to 0.300 km in main canal and from 0.200 km to 0.300 km in Gausipur minor. Lot-03
2 documents required · 2 mandatory
₹854
₹58,700
Yes
12 Jan 2026
4 Sept 2024
13 Sept 2024
4 Sept 2024
13 Sept 2024
4 Sept 2024
Amount
C.C. lining work for main canal from D-Tank to 0.300 km Earth work in mar kabar, Rankar and kankar mixed soils in digging or filling for strengthening of canal slope , bed in feedar line from delivery tank inlcluding lead upto 30 m. and lift upto 1.5 m.
Sand filling in foundation i/c all cost of material, labour ,T&P etc.
Centring and shuttering for C.C. work
Laying cc 1:1.5:3 with 10-19 mm gauge stone ballast i/c all cost of material, labour, T&P etc.
Bitumen painting on sleepar
Filling joints of C.C lining with Bitumen.
Laying LDPE polythene under plaster with 3.5 m width each.
C.C. lining work for Gausipur minor from 0.200 km to 0.300 km Earth work in mar kabar, Rankar and kankar mixed soils in digging or filling for strengthening of canal slope , bed in feedar line from delivery tank inlcluding lead upto 30 m. and lift upto 1.5 m.
Sand filling in foundation i/c all cost of material, labour ,T&P etc.
Centring and shuttering for C.C. work
Laying cc 1:1.5:3 with 10-19 mm gauge stone ballast i/c all cost of material, labour, T&P etc.
Bitumen painting on sleepar
Filling joints of C.C lining with Bitumen.
Laying LDPE polythene under plaster with 3.5 m width each.
santosh kumar pal
M/S PARUL CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf