U P Irrigation Department (Mechanical)
Chief Engineer (Tubewell Centre)/Superintending Engineer(Tubewell)-Banda/Executive Engineer MLCD Banda
Cancelled
Construction of RCC pedastal from P1 to P58 for 500 mm dia MS Pipe line And laying and Erection of MS Pipe line 500 mm dia length 260 m . Chainage 1.180 km to 1.220 km and Chainage 1.300 km to 1.520 km in Main pipe line.New Ramjanki Pump Canal 20 cu
MLCD BANDA | Banda, Uttar PradeshLast activity 2 Nov 2026
UP
Cancelled
UP
Cancelled
Est₹33.5 LL1
Not applicable
This company
M/s Parul Construction
Tender cancelled