Loading…
Loading…
40 results • Latest
Internal clearance of Ghel Drain from RD 3.715 to 0 km before Monsoon season 2026-27
Internal clearance of Model Town drain from RD 0 km to 4.440 km before monsoon season 2026
Internal clearance of Ambala Drain from RD 10400 to 0 before monsoon season 2026-27
Automatic Garbage Extraction machine at Mahesh Nagar Drain near pump house..
Construction of bridge across Mahesh Nagar drain including opening for water way to new pump house and rehabilitation of old pump house building including M S Trash rack with foot bridge, boundary wall with main gate etc.
Repairing Damaged/washed patch both side lining of SYL Canal from km 7 to 9 km and construction of slab at 9.00 km gate of SYL parallel drain gate
Repairing of Damaged/washed patches both side lining of SYL Canal from km 5 to km 7
Repairing Damaged/washed patch both side lining of SYL Canal from km 7 to 9 km and construction of slab at 9.00 km gate of SYL parallel drain gate
Repairing of Damaged /washed patches both sides lining of SYL Canal from km 9.15 to 13km
Repairing of Damaged/washed patch both side lining of SYL Canal from 3 km to 5 km