Loading…
Loading…
48 results • Recent activity
Automatic Garbage Extraction machine at Mahesh Nagar Drain near pump house..
Construction of bridge across Mahesh Nagar drain including opening for water way to new pump house and rehabilitation of old pump house building including M S Trash rack with foot bridge, boundary wall with main gate etc.
Repairing Damaged/washed patch both side lining of SYL Canal from km 7 to 9 km and construction of slab at 9.00 km gate of SYL parallel drain gate
Repairing of Damaged/washed patches both side lining of SYL Canal from km 5 to km 7
Repairing Damaged/washed patch both side lining of SYL Canal from km 7 to 9 km and construction of slab at 9.00 km gate of SYL parallel drain gate
Repairing of Damaged /washed patches both sides lining of SYL Canal from km 9.15 to 13km