Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹8.9 LRejected-Finance GROUND 600 23 LAXMI GARDEN GURUGRAM GURUGRAM HARYANA 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹8.9 L | L2 | Rejected-Finance Highest |
| 3 | L3₹9.2 LRejected-Finance 309 NEAR SHIV MANDIR MUNDH ASSANDH KARNAL 132039 | KARNAL | KARNAL | HARYANA | 132039 | ₹9.2 L | L3 | Rejected-Finance Highest |
| 4 | L4₹9.9 LRejected-Finance | ₹9.9 L | L4 | Rejected-Finance Highest |
| 5 | L5₹10.7 LRejected-Finance | ₹10.7 L | L5 | Rejected-Finance Highest |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
11 Jun 2026, 11:00 amClosed
SANDEEP KUMAR
SYL W.S. Divn. Ambala
Construction of Car parking 2nd phase in office building near police chowki of Canal Colony Ambala
2026_HRY_527213_1
202673EA30C2 034D 4EC3 88CB 18CD3A3703E4143IRR
Open Tender
Civil Works
Works
90 days
Ambala City
2 documents required · 2 mandatory
₹1,000
₹19,000
Yes
24 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. | 707.92 | Sqm | 655 | ₹4,63,688.26 |
| 2 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to any lead and lift also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 646.9 | cum | 138 | ₹89,272.75 |
| 3 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 5.2 | cum | 3,975 | ₹20,654.1 |
| 4 | [6.1.3]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 3. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 107.89 | cum | 3,426 | ₹3,69,620.86 |
| 5 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 17.05 | Sqm | 155 | ₹2,642.29 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_606197.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].