Loading…
Loading…
369 results • Latest
Prov. 200KVA T/F, HT/LT line and LED street lights on T-points in Auto Market, Sector-3, Sonipat
[11.69.2]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 2. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre [Through Rate]
Providing and Laying of RCC NP-3 Pipe from Gurudwara Sahib to Vita Booth via Past office and Post office to old Delhi Road via K.V Collection Prem Nagar Ward no. 13 Ambala City (recall)
Providing and Laying of RCC NP-3 Pipe from Gurudwara Sahib to Vita Booth via Past office and Post office to old Delhi Road via K.V Collection Prem Nagar Ward no. 13 Ambala City
AMtc of EPHS in Sector 10 UE Ambala City Supply of copper sulfate TCCA Chlorine 20mm rope Soda ash Salt Acid complete in all respect
Select, Excess (+), Less (-) Less (-)
AMtc of EPHS in Sector 10 UE Ambala City Supply of 2 1/2 suction pipe stater 5HP 2 House pipe 2 1/ 2 4 core wire dewatering of water complete in all respect and all other works contingent thereto
[30.1]Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
AMtc of 2 MLD STP in Sector 7 UE Ambala Providing painting and earth filling at STP in Sector 7 Ambala City complete in all respect and all other works contingent thereto
[11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand)
AMtc of EPHS in Sector 7 Urban Estate Ambala City Providing and fixing of street light, submersible cable at 2 MLD STP Sector 7 Ambala complete in all respect and all other works contingent thereto
[24.10.2]CIVIL ITEMS (USED COMMONLY IN ELECTRICAL WORKS) 2. Earth work in excavation in foundations, trenches etc. in all kind of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, staking the excavated soil clear from the edge of excavation and subsequent filling around masonry, in 15cm layers with compaction, including disposal of all surplus soil, as directed with in a lead of 30 metres.