Loading…
Loading…
1,504 results • Latest
Maintenance kit for Duplex Check valve as tabulated below. Drawing : Part No.- 790 039105 [ Warranty Period: 30 Months after the date of delivery ]
Security plate for centre pivot arrangement. Drawing No. :- To drg. no 1. RCF 1268843. version-00R , 2. ICF_AAA05067 alt. a Specification :- C- K201(amendment no. 1)_with Corrigendum no.1 Special terms & condition :- (i) Mat. To be either C-K201 X5CrNI 18,-10(304) 2D/2B OR AISI 304 (ii) Marking to be as per ICF Drg [ Warranty Period: 30 Months after the date of delivery ]
Safety wire rope Assembly for FIAT Bogie. Drawing No:- LW 05105 alt.(a) Specification:- MDST-147 Rev.(nil) [ Warranty Period: 30 Months after the date of delivery ]
Isolating Cock OLP Type with Vent Hole (Ball Type) for brake cylinder only. Drawing No.:- RDSO/ SK- 98013 alt. (nil) Specification: - 02-ABR-2002 with 4 Amendments , Appendix- I [ Warranty Period: 36 Months after the date of delivery ]
ELASTOMERIC COPPER CABLE 16 sq mm 126/0.4 SINGLE CORE 750V GRADE AS PER RDSO SPEC. E-14/01 [REV-2] 1993 PART- I & II.
Synthetic Enamel, Interior, Undercoating, White for the system of Interior painting of coaches. Specification:- IS 133:2023(Sixth Revision) including optional requirements mentioned in Table 2 & 3 of IS 133:2023(Sixth Revision) with RDSO Amendment No.1A (Rev.1.0) as an additional requirement. Special terms & conditions:- i - Material shall be packed in 20 Ltrs. metal containers conforming to IS:2552/1989_amend.1 (Third Revision) (Reaffirmed 2018) Grade B- 1. ii - The goods should be dispatched within 02 months from the date of manufacturing and firm will give an undertaking that the material supplied is not more than 60 days old . iii - Suppliers have to write on the container Batch No., Date, Month, Year of Manufacturing and also write the paint can be used before 12 months from the date of manufacturing. iv - Keeping Properties - Not less than One Year from the date of manufacturing. [ Warranty Period: 30 Months after the date of delivery ]
Water tank (450 litres) complete without frame upper part (item no 3) as per Drawing:- LP63117 alt- f Specification No:- MDTS 093 REV.08. [ Warranty Period: 84 Months after the date of delivery ]
PRIMARY BUMP STOP FOR FIAT IR BOGIE. Drawing No.:-1227081 alt. 04R2. Specification No. :- T.S. 17.531 100 03,T.S.17.617 100 02, RCF/MDTS 148 Rev.01 & RCF/MDTS 122 Rev.03. [ Warranty Period: 48 Months after the date of delivery ]
Ball Valve for sanitary facilities for LHB coaches. Drawing No : LW 63106 Alt.(a), ANX-2 Item-3 [ Warranty Period: 30 Months after the date of delivery ]
3/4 INCH ISOLATING COCK WITH VENT AS PER DRG. 0/2/65/364 REF.3 ALT-7 OR LATEST
AMI No- 25 ct 0092026-27 Equivalent To Floseal. USFDA Approved Or Approved In The Last/Latest DGS&D Rate Contract/BIS Approved/Previous Complaint Free Supply To NRCH.
3/8 INCH LEVER OPERATED HORN VALVE AS PER CLW DRG. 0/3/65/95 ALT-5 OR LATEST
Hand Brake Shaft with Standard Washer and M-27 Nut, Sleeve & Rivet 10 dia
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Provision of Coach Guidance display boards and Train Information display boards at 11 number of ABSS stations of Delhi Division of Northern Railway.
Supplying of machine crushed hard stone track ballast-34335 Cum confirming to RDSO's Railway specification (IS/RDSO-GE/0001: 2023) February 2023 and latest correction slip as directed from identified source from Ramkumarpura mining area, located at Village Ramkumarpura, Tehsil Khetri, District Jhunjhunu, Rajasthan, including leading to loading point and loading the same into BOBYN type Railways wagons from NIZAMPUR/MAONDA Railway Stations ( in NWR Region). The rate is inclusive of all cost, contractor labour, tools plants and machinery complete including all lead, lift, taxes, royalty charges and duties including making approach road and other arrangements for stacking ballast at site as required for complete job as directed by Engineer in charge.
Provision of CCTV at Non-Interlocked LC Gates Over Jammu Division.
MEMU 3 phase axle box helical coil spring Drg No DC/EMU/M 0 1 203
Procurement process for Supply, Installation, and Commissioning of 3T Jib Crane with lifting accessories for HRE Van of ART/LDH.
IOH Maintenance schedule kit (Sub kit IOH-2B) of 34 uncommon item specific to M/s BT (now M/s REPL) type Tap Changer as per Annexure-R3 & Annexure IOH- HW-3 of RDSO Technical Circular No. RDSO/2010/EL/TC/0102 Rev. 2 dt. 06.08.2021.
3/4 INCH STRAIGHT UNION WITH SOCKET AND CHECK NUT AS PER CLW DRG. NO. 0/3/65/8 IS:2108/1979.
Comprehensive Annual Maintenance Contract (CAMC) of Johnson make Lifts installed at HW-02 Nos., DDN-02 Nos. & MB-02 Nos. for 5 years over MB Division.
Comprehensive Annual Maintenance Contract (CAMC) of Johnson make Escalators installed at HW-04 Nos., DDN-02 Nos. & YNRK-04 Nos. for 5 years over MB Division.
STAINLESS STEEL BED AS PER DRAWING NO. NR/DC/117 DT NOV 2013 WEIGHT OF THE BED IS 45.5 KG (+2.0 KG -1.5 KG) AS PER DRAWING/ ANNEXURE-A ENCLOSED AND ITEM WILL BE DELIVERED AT HARIDWAR STATION.
Provision of Relay Hut at (10 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) under ADEN/JRC in the jurisdiction of Sr.DEN-I/FZR as per Type Plan No. HQ/01/02- 2017/R-1
Provision of Relay Hut at (14 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) under ADEN/LDH in the jurisdiction of Sr.DEN-I/FZR as per Type Plan No. HQ/01/02- 2017/R-1
Misc. P.way Zone works in the section of SSE/P.WAY/NSS in the jurisdiction of ADEN/LDH.
ROTARY SWITCH FOR BATTERY 100 AMPS.ON-OFF, 4 POSITION AC/DC TYPE KAYCEE- C1023.
Supply, installation and commissioning of Air compressors 5 HP capacity, Double stage
Construction of RUB in lieu of LC No. 28/C, 36/C and LC No. 31C on Phaphamau- Unchahar Section of Lucknow Division on Northern Railway under DyCE/C-V/LKO
Dismantling, Shifting of EPPFS from underslung to onboard (including pneumatic and Electric connections) and testing of Electro Pneumatic Pressurized Flushing System of LHB coaches at C & W Depot ASR and FZR (As per Scope of work).