Loading…
Loading…
4,885 results • Latest
NCTPS I SE MI Circle R M 24 25 BM Dn Unit I II III Arresting of Flue gas air leakage in air pre heater guide bearing air seal assembly rectification of eroded portion in center section of Guide bearing area and rectification of defects in pin rack
Works contract for Central Stores Materials Handling
Improvement works along with other allied works to the AE/D/Kappalur section office building pertaining to Thirumangalam Division of Madurai EDC
SUPPLY ERECTION AND COMMISSIONING OF 300 NB M S SEAMLESS PIPE WITH SUPPORTING PEDESTAL FOR FURNACE OIL PUMPING LINE FROM IOC TERMINAL TO UNIT I TO V OF FUEL OIL PUMP HOUSE FOR A LENGTH OF 110 MTRS REACH III, FIRST WATCH TOWER TO NEAR TRANSFER PUMP
Supply, Erection, testing and commissioning of 11 KV RMUs for EOS to various TNUHDB Projects in respect of CEDC/Central
NCTPS I SE MI Circle R M 24 25 BM Dn Unit I II III ESP Reconditioning of defective EERM Gear boxes
Improvement works along with other allied works to the AE/D/Kalligudi section office building pertaining to Thirumangalam Division of Madurai EDC
Supply and Erection of materials for erection of new 11KV dedicated feeder for Ezhilagam complex on turnkey basis
Clearing the Scrub Jungle in Type 1 Block No. 18 to 20 area and Type 1 GLR area at Analmin Nagar
Colour washing by thorough scrapping the existing wall surface (interior, exterior), applying one coat wall putty and providing 2 coats of Exterior or interior emulsion paint over one coat of emulsion primer to the AEE SER and Revenue building.