Loading…
Loading…
5,618 results • Latest
Cleaning of accumulated Ash inside pent house and water washing inside boiler 2nd pass
MTPS-I ES Circle EMII SDIII Complete cleaning, Tightness checking of horizontal, vertical bus bars, Bus bar joints, OG terminals and checking IR value of HT buses of AHS Unit-I, II,III IV at AHPH stage I II during respective Unit AOH COH
Inspection of bottom side gooseneck slope area of rear water wall screen tubes
Rectification Works to Inner Walls and Floors of 0m, 5.50m, 10.50m Floor in between A and B Row Wall in Power House Building of Unit 5
MTPS-I ES Circle EM-II SD-III Cleaning of the Main busbars, Vertical bus droppers, LT Breaker panels, LT breakers and LT modules of LT Switchgear at AHPH Unit I,II,III IV during respective Unit AOH COH for the year 2026-27
Rectification Works to Inner Walls and Floors of 0m, 5.50m, 10.50m Floor in between A and B Row Wall in Power House Building of Unit 4