Loading…
Loading…
5,601 results • Latest
TTPS Mech II BM Unit I Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2025 2026
TTPS Mech II BM Unit I Overhaul of long retractable soot blower LRSB and water wall soot blower during the year 2025 2026
Spares for Cooling Water Pumps Stage II
Remedial measures by Strengthening and Protective Coating to the RCC PSC Structures of Coal Jetty 1 Conveyor System - 14 from JT 1E towards West Long Span 11 - 12, Short Span 13 - 14 of TTPS in Red Gate area North Break Water of VOC Port at ECHS
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to the steel structure and wall area at 17m to 27m level C row, grid 15A to 25 of Unit-II Power house building
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and Maintenance works to the Raw water Fire water Switch gear Room at NCTPS-II