Supply erection testing and commissioning of 384 Volts 400AH 192 cells Lead Acid Tubular battery set with accessories by replacing the existing LATB set 192 cells 384 volts 400 AH
TTPS Mech II TM I Unit I Forthcoming Capital Overhaul Removal of Insulation over the HP IP casing and middle part of LP casing and re insulation over the same after completion of overhaul including supply of insulating material
Supply erection testing and commissioning of Lead Acid Tubular battery set 400AH 360 Volts 180 cells with accessories by replacing the existing LATB set 180 cells 360 volts 400 AH
MTPSI ES Circle EMI Replacement of M s BHEL make 210MW LMW Turbo generator defective TG rotor D of Unit IMTPSI by MTPSI healthy spare rotor E.
MTPS I M II OAHS Wet Ash Strengthening of the bunds and segregation of LAD
MTPS I M II OAHS Removal and transportation of retrieved ash from Primary pond I and II to LAD UAD
Supply of Cast alloy steel Non - Return valve-08 Nos. Size NB 65 mm (2.5 inch dia)
Re tubing of LP Heater Tube nest by 90/10 Cupro Nickel Tubes 1 No
Hiring Vehicle for the use of EE MRT 6 Months for Implementation of Feeder Metering AMR
Repair and Reconditioning of defective IP rotor of 210 MW LMW design Turbine released in the year2020 from Unit I MTPS I due to high run out