Loading…
Loading…
22 results • Recent activity
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-01 Ch.101.800 to Ch.107.100 (Design Build)
Carrying out road cleaning work from km 38.000 to 52.900 (Vada Nemmeli to Mahabalipuram) on both sides including service road foot path and junction attending patch works and Vegetation removal at East Coast Road (ECR) for one year
Carrying out road cleaning work from km 22.300 to 38.000 (Akkarai to Vada Nemmeli) on both sides including service road foot path junction and toll plaza attending patch works and Vegetation removal at East Coast Road (ECR) for one year
Supply and installation of street light poles with 150w LED fittings including supply and laying of HDPE Pipe UG cables Supply and erection of Metering Panels Control panels at the stretches handed over by CMRL Km4.070 to 6.500 Km7.300 to 8.650 inOMR
Construction of new footpath and widening of Main Carriageway from km 27.240 to 27.750 (LHS) Kanathur in East Coast Road (ECR)
Resurfacing including Milling the BT surface of selected stretches of K K Salai (ECR Link Road) from Sholinganallur Jn to Akkarai LHS 0.45 km Ch 0.950 to 1.150 and 1.750 to 2.000 RHS 0.55 km Ch 0.950 to 1.150 1.250 to 1.400 and 1.700 to 1.900