Loading…
Loading…
144 results • Latest
Conversion of existing 11 KV Overhead Line by Underground Cable with laying of 140 mtr 3 X 300 Sq.mm and 240 mtr 3 X 95 Sq. mm. XLPE Cable at Location Haur Station
Draning out of washout and over flow water from 500 Cum Capacity Over Head Reservoir to the near by natural ditch of Augmentation of Kumirda Water Supply Scheme and its adjoining mouzas in Contai-III Block
Rising main 200mm dia DI K9 Rising main pipeline with specials and other allied works at 4th Tube Well Site for Augmentation of Mukutshila Zone-II water supply Scheme
Dismantling chlorinator room and Staff quater at Head Work Site of Contai S.A. Zone-I Phase-B PWSS
Laying of HDPE pipes with allied works at Left Out Portion of PART-J for Augmentation of Mukutshila Zone II (Phase-II) PWSS
Laying of HDPE pipes with allied works at Left Out Portion of PART-M for Augmentation of Mukutshila Zone II (Phase-II) PWSS
Laying of Distribution pipe line by UPVC pipes with allied works of Left out portion of Vill- Nankar Bamunia within Barasubarnanagar PWSS in Contai-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.
Land Development at 4th Tube Well site of Shillaberia Jhanka Zone-I PWSS within Khejuri-II Block under Contai Sub-Division of Tamluk Division, PHE Dte.
Installation of Submerssible Pump with pipe lines and 1000 ltr.overhead tank at Baki Bheri High School under Bibhisanpur Gram Panchayat within Bhagwanpur-II Block
Construction of 3.60 mtr x3.00mtr. Size Switch Room cum Chlorin Room for Source Augmentation of Bamunia W/S Scheme