Loading…
Loading…
143 results • Latest
Construction of 3.60 mtr x3.00mtr. Size Switch Room cum Chlorin Room without sanitary and water supply arrangements including Plinth Protection at 3rd TW site for Pratapdighi water supply Scheme within Patashpur-II Block
Laying of 270 mtr 11KV 3X185sqmm XLPE cable through 240 mtr micro tunneling with HDPE 160 mm dia. PE-80 PN-6 and other allied works
Guarding Round the Clock Arrangements to protect the Govt. properties , materials etc. at Office campus of Contai Sub-Divisional Store under Tamluk Division, PHE Dte.
Round the clock office guarding arrangement under Haldia Sub-Division office of Tamluk Division, PHE Dte. for 10 Months.
Renovation and Repairing of existing pump house H/W site and 2nd TW Site of Bagmari Water Supply Scheme within Egra-I Block under Digha Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur.
Construction of R.C.C. Over Head Reservoir of capacity 250 cum. and staging height 20.00 mtr. for Tamalda Water Supply Scheme within Egra - I Block under Tamluk Division, PHE Dte.
Renovation and Repairing of OHR and existing pump house and Boundary wall at 2nd Tube well site of Kudi Water Supply Scheme within Egra-I Block under Digha Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur.
Sinking of Tube Well , Laying distribution system, Pump House at Head work site 2nd tube well site, Soil Test, OHR ( 250 Cum ) FHTC ( (1636 nos ) Boundary wall and Rising Main and 2 Years Maintenance under JJM with allied work for Jumki PWSS
Leftout pipeline to accommodate FHTC under JJM of Jumki Water Supply Scheme within Egra I Block under Digha Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur.
Providing FHTC (Functional Household Tap Connection) of Negua its adjoining mouza Water Supply Scheme within Egra-I Block under Digha Sub-Division of Tamluk Division, PHE Dte.in