Loading…
Loading…
427 results • Latest
TTPS Mech II BM Unit - Erection of Cold Intermediate heating elements of Type E27 for Unit I Airpreheater Model 27 VIT M 2000
MTPS I Mill Plant Unit III Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece in
Improvement works of Raising the height of the existing compound wall for about 0.80 and 0.40m at substore south side wall in Kovilpatti Division office premises
Improvement works for the formation of yards basement wall and metal spreading in yard areas in the 33kv Kurumbur SS, Tuticorin EDC
Improvement works by filling of 10and20mm size metal in 110 KV yard area with allied civil works of the substation premises at 110KV Kovilpatti SS.
Improvement works by providing Aluminium partition for AEs office at MRT subdivision and allied civil works in MRT lab at Tuticorin EDC.
MTPS I Mill Plant Unit III Overhauling of gravimetric feeders and clean out conveyor of mill 3A to 3F during AOH 2026 2027
MTPS I Mill Plant Unit III Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit III during Annual overhaul 2026 27
Providing one number Diesel Driven Jeep/Van/TATA Sumo or equivalent vehicle 5 year model on hire basis for the official use of EXECUTIVE ENGINEER / MRT / THIRUVARUR Period one or Two Years
Execution of Works under Running Contract for Capital, Improvement and Deposit Contribution Works (DCW) in Kanyakumari Sub division of Nagercoil Division in respect of Kanyakumari EDC for an amount of Rs.15 Lakhs for one year