Loading…
Loading…
4,884 results • Latest
NCTPS I SE M II Circle AHP Dn Complete cleaning of outer surface of Cast basalt lined MS pipe having OD 406 mm and painting the Epoxy Primer and Coal thar black paint in Ash slurry disposal line 2 and 3 from NCTPS II compound wall to Recovery water
Hiring of 1 No. Diesel / Petrol Driven VAN / JEEP for official use of Executive Engineer / OandM / South Kanchipuram
Supply of STAY CLAMP FOR 9 MTR PSC POLE
Supply of STAY CLAMP FOR 8 MTR PSC POLE
Supply of STAY SET COMPLETE
Provision of Annual Maintenance Contract
Supply of LT SINGLE PHASE CHANNEL CROSS ARM
ECHP-II-Checking inspection and monitoring the conveyor 48A1 and conveyor 48B1 from the date of entrusting the work and upto 31.03.2027
Supply of LT SINGLE PHASE ANGLE CROSS ARM
Supply of LT THREE PHASE CHANNEL CROSS ARM