Loading…
Loading…
6,106 results • Recent activity
MTPS I CA CWS II Unit III Replacement of corroded and eroded MS pipe of size 1600mm dia in the existing Hot water header pipe lines and its supporting structures in Eastern and western sides of Cooling Tower III during AOH 2025 26
MTPS 1 BM Unit II AOH 2025 26 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Air Pre Heater outlet Flue gas duct both A and B sides
MTPS I M I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves etc
MTPS I BM UNIT II Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of worn out buck stay pin Fabrication of buck stay cover plate etc
MTPS I BM Unit II Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit II Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate