Loading…
Loading…
6,106 results • Recent activity
MTPS I BM Unit II Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and allied works
MTPS 1 CA RWS Overhauling of Auxiliary Cooling Water Pumps 3Nos and Reconditioning of surface discharge head including painting of pump accessories and ACW pipe lines etc
MTPS 1 BM Unit III AOH 2025 26 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Air Pre heater hoppers including the cost of materials
MTPS I BM Unit III AOH 2025 26 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Inspection and Rectification of worn out lines and bends of Super heater header drain lines and allied works
MTPS-II -Mechanical-II - CHP-II - FPS - H.V.W.S of GTs - Supply and Erection of pressure switches in spray pipelines at Generator Transformers and laying of Instrument Analog Cable from the pressure switches to UCB