Loading…
Loading…
106 results • Latest
Upgradation of Existing Four Lane Carriageway to Six Lane from Ch 0.000 (Existing km 0.000) (Kandla) in Gandhidham to Ch 71.350 (Existing km 71.400) (Mundra) near Moti Khakhar (Length 71.350 km) section of NH 41 in Gujarat under Hybrid Annuity Mode
Up-gradation of the missing link of the Amritsar-Jamnagar Economic Corridor between Maliya and Pipaliya section of NH-151A (Length 24.611 km) in the State of Gujarat on HAM
CS for AE for Cons. of GSS at 14.440 and 14.279 (Kawas Patiya) 11.225 24.907 (Abhava Junction) 25.720 (Mindhola Jun.) 27.121 (Khajod Junc.) Paved Shoulders on Hazira Port-Surat-Gujarat/Maharashtra Border Section of NH-53 in Gujarat on EPC Mode.
Construction of 4-lane Kotdwar Bypass of NH-119 in the State of Uttar Pradesh and Uttarakhand on EPC Mode under NH(O)
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
BW for Cons.of 4lane Greenfield DAKE from Jun. with Jalandhar Kapurthala road (NH703A) near Khojewal village to Junction with Amritsar Mehta Sri Hargobindpur Tanda road (NH503A) (Km 319.400 to 362.420) on EPC mode under NH(O) in Punjab (PKG-11)