Loading…
Loading…
105 results • Latest
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
CS for IE for the Dev. of 4/6L of access controlled Kanpur Kabrai 0 (Kanpur Ring road) to design km117.700 in UP (Sec1)and Overlay/Strengthening other road safety and imp.works existing Kanpur Kabrai sec.7.430 to 130.100 (0 to 123.860)NH 34 in UP
Balance work of 2L with paved shoulder of Najibabad Kotdwar sec of NH119 from Ch.122.200 to Km. 137.760 Exist Ch.138.635 in the state of Uttar Pradesh
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode