Loading…
Loading…
106 results • Latest
IE services for const. of 2L with paved shoulder from Hiwarkhedi to Roshni sec of NH347B km0.000 to km90.010 and 2n4 L with PS km114.000 near Ashapur Vill to km 149.000 near Rudhy vill sec of NH347B of Betul Khandwa corri(L125.010 km) in MP on HAM
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)
4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode.
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Construction of 4-lane Thiruvarur Bypass (Km 15.900 Km 30.836) in Nagapattinam Thanjavur Section of NH83 in Tamil Nadu on Hybrid Annuity Mode (Project Length 14.936 km)