Loading…
Loading…
106 results • Latest
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
2 Lane with Paved Shoulder/4 Laning of Damoh Jabalpur Section of NH 34 (PKG I and III) in Madhya Pradesh From Damoh (Design Ch. 4.050km) to Jabera (Design Ch. 43.500) and From Katangi (Design Ch. 66.800km) to Jabalpur (Design Ch. 86.302) on HAM
Widening and Upgradation of existing highway from Khagaria (DC. 270.000) to Purnea (DC. 413.529) section of NH31 and NH231 to 4 lanes with paved shoulders standard in the state of Bihar on DBFOT (Toll) mode
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I).