Loading…
Loading…
106 results • Latest
Independent Engineer Services for 4 Laning of Muzaffarpur Sitamarhi Sonbarsa section of NH22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Authority Engineer Services for Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
Const of Gr Separated Structure at 24.907 Abhava Jn 25.720 Mindhola Jn 27.121 Khajod Jn include RE Walls Service Rd and Drains along with missing Service Rd and conversion of Earthen Shoulder to PS on Hazira Port Surat GJ/MH Border of NH53 in GJ on E
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II