Loading…
Loading…
105 results • Latest
Construction of 6 lane Viaduct and service road from Baikampady (Km.365.200) to KIOCL junction (Km.368.275) of NH-66 in the state of Karnataka on EPC mode
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L of 78.000 Km in the State of Telangana under NH(O) on HAM PKGII
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Consultancy Services for Preparation of Detailed Project Report for 4-Laning of Katra Reasi Mahore Gulabgarh Nandimarg to Kulgam to NH44 in the UT of JK
Develop.of 6L UER2 NH 344 M NH1 Km0.700 to Dwarka Sec24 Road Km38.111 in Delhi n 4L RS NH344 N NH344 M Delhi at Km26.135 of NH344 M UERII till BHD byp of NH10 near BHD in HR pkgI 2 3 NH344M n 5 NH344N 2 call Works at RnC of EPC Contractor
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).