Loading…
Loading…
109 results • Latest
Supply Installation Testing and Commissioning of 02 nos. of 4 Ton Cold Cassette AC and 02 nos. of 3 Ton Hot n Cold Cassette AC Units at Head Quarter Buildings of National Highways Authority of India G 5 n 6 sector 10 Dwarka New Delhi 110075 2nd Call
Supply Installation Testing and Commissioning (SITC) of 04 nos. new Passenger Lift replacing existing Passenger Lift at Old National Highways Authority of India G 5 n 6 sector 10 Dwarka New Delhi 110075 2nd Call
Operation and Maintenance of Four Laning work from Hiran River to Sindoor River from Km.66.00 to 130.00 (Excluding Nauradehi Wildlife) section of NH-12 (New NH-45) in the states of Madhya Pradesh under PBMC mode
Consultancy Services for Preparation of Detailed Project Report (DPR) for 6-Lane Access Controlled Development of the Existing 4 Lane Pune Solapur Section of NH65 in the State of Maharashtra (Length215Km).
Rectification of 3 Blackspots at Km 314.500 (Maruthi Nagar) Km 316.400 (Srirangam Y Junction) and Km 320.070 (Sanjeevi Nagar) in Padalur Trichy section of NH 38 in Tamil Nadu on EPC Mode
IE for Const of 6L GF AC Indore E By km113.00 on NH 347BG vill Simrol Datoda vill and at km139.630 Nanded vil pkg2 of Indore L26.630 Km n RnU of NH52 Ex.18.000 Khandwa Vill to km27.00 Ahilyapur vil 4Lto6L pkg2 of Indore L9.00 Km in MP NHO TL35.630km
IE services for Const of 6L GF AC Indore Eastern Bypass starting from design km 64.000 near Pirkaradiya vill and ending at design km 113.000 on NH 347BG near vill Simrol Datoda pkg1 of Indore n Dewas district in MP on HAM Mode L 49.00 Km
Const of 4/6L GF Ludhiana Rupnagar NH 205K from Jn with NE to Manewal (Ludhiana) to Jn with NH205 near Bheora (Rupnagar) with Ludhiana bypass under NH(O) in Punjab on HAM PKG 2 DC 37.700 to 66.440 and Ludhiana Bypass DC. 0.000 to 18.500 TL 47.240 km
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
CS AE for supervision of Cons. of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (61.500 to km 67.380, km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode