Loading…
Loading…
148 results • Recent activity
Const. of 6 lane Zirakpur Bypass Starting from Junc. with NH7 Zirakpur Patiala DC 0.000 and ending at Junc. with NH5 Zirakpur Parwanoo DC 16.800 TL 19.200 Km in Punjab and Haryana under NH(O) on HAM
IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch.0.000 to Garhani (at SH-12) at Ch74.432 package-1 of Patna Arrah sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call)
4 laning of NH 167 from Gudebellur at Design Km 182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on Hybrid Annuity Mode (HAM) in the state of Telangana
Construction of Six Lane Greenfield Patna Ring Road Highway (NH131G) from Kanhauli to Sherpur (from Km. 0.000 to Km 8.480) including Junction Development with Bihta Danapur elevated corridor (length1.5 Km) (TL 9.98 Km.) in Bihar.
Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode
Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode