Loading…
Loading…
159 results • Latest
IE Services during Operation and Maintenance Period for Six-laning of Chilakaluripet to Nellore section of NH-16 from KM.1182.802 to KM.1366.547(length 183.620) in the State of AP under NHDP Phase V to be executed as BOT(Toll) project on DBFOT patter
Supervision Consultancy Services (SC) for Operation and Maintenance of Vaggampalle to Dornala T-junction section from Km. 293.266 to 359.422 of NH-565 (Total length 66.156 Km) to 2-lane with paved shoulder in the state of Andhra Pradesh on PBMC Mode.
Supervision Consultancy Services (SC) for Operation and Maintenance of Penchalakona to Yerpedu section of NH 565 from Km 425.400 to Km 509.400 (Total length 84 Km) to 2-lane with paved shoulder in the state of Andhra Pradesh on PBMC Mode.
Supervision Consultancy Services (SC) for Operation and Maintenance of four lane NH-4 from AP/TN Border to Nalagampalli (Length 37.110 Km) and Nalagampalli AP/Karnataka Border (Length 47.687 Km) in the state of AP.
Routine Maintenance including Incident Management (Excluding Ambulance Services) and Safety Improvements for Nellore Bypass (4L length of 14.668 Km) section of NH-16 and Badvel to Chunchuluru Section (2L length 23.645 Km) of NH-67 in the state of AP.
Independent Engineer Services during Operation and Maintenance of Six-laning of NH-71 from Renigunta (Km. 0.000) to Naidupeta (Km.57.046) (Length-57.046 Km.) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojana.
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Gobindpur (NH 55) to Tangi from Km. 70.995 to Km. 111.325 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 3)
IE Services for Construction of 4 laning of Patna-Arrah-Sasaram corridor PKG-2 1.Garhani at Ch.Km73.700 to Patar at Ch.Km84.300 2.Greenfield from Sadisopur at Patna Ring Road (NH-131G) Ch.Km0.000 to Asani Ch Km35.800 of NH-119A in Bihar on HAM Mode
Construction of 4 Lanning of Badnawar-Petlawad Thandla-Timarwani section of (NH-752D) from Badnawar Bypass Ch.70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE-4) Ch.150.850 in the state of Madhya Pradesh on HAM under NH(O)
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode